水电工程投资风险储备金估算数学模型研究 被引量:5

A study on the mathematical estimation model of contingency reserve for investments in hydro-electric engineering project
下载PDF
导出
摘要 为提高我国水电工程项目管理水平,采用现代风险管理的理论和方法,对建国以来若干水电工程投资变更进行量化分析,分离出当前我国水电工程建设的风险要素。在此基础上,建立一种新型的水电工程投资风险储备金估算数学模型,并给出模型中各风险变量的确定方法。运用此模型,不仅可以提高风险储备金估算的准确性,而且工程投资主体可以在项目前期主动对关键风险进行处置和管理,有效降低项目投资变动风险。 The concept of contingency reserve is introduced to respond to the risks involved in the investment of hydro-electric projects. The key issue herein is how to estimate the quantity of the reserve. In order to enhance the estimate ability, a new model on the basis of modem risk management method is proposed and developed in this paper. In this model, two kinds of risk variables are defined, namely, they are subjective and objective variables. The reserve is calculated by using the formula defined in the model which involves all the variables. Three techniques are employed to estimate the probability distribution function of these variables. The gray forecasting technique and the ARMA model are discussed in some details. The proposed model can help investor to manage the key risks on a project, thus reduce its cost variations.
出处 《土木工程学报》 EI CSCD 北大核心 2006年第7期119-123,共5页 China Civil Engineering Journal
关键词 风险储备金 主观型变量 客观型变量 灰色预测法 博克斯-詹金斯法 contingency reserve subjective variable objective variable gray forecast technique ARMA
  • 相关文献

参考文献6

  • 1水电工程设计概算编制办法及计算标准[S]. 被引量:1
  • 2孙建敏.水电项目投资建设期风险分析[D].北京:清华大学,2000 被引量:1
  • 3陈全会等主编..水利水电工程定额与概预算[M].北京:中国水利水电出版社,1999:270.
  • 4强茂山,蔡航清,李国华.我国水电工程风险储备金计算方法研究[J].水力发电,2003,29(3):1-5. 被引量:4
  • 5徐国祥主编..统计预测和决策[M].上海:上海财经大学出版社,1998:418.
  • 6云南漫湾水电站工程修编概算[M].昆明:昆明勘测设计研究院,1993 被引量:1

二级参考文献7

共引文献3

同被引文献26

引证文献5

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部