摘要
现代建筑项目应对其从项目前期策划直至项目拆除的全过程进行策划、协调和控制,以使该项目在预定的建设期限内、在计划的投资范围内顺利完成建设任务,并达到所要求的工程质量标准,满足投资商、项目的经营者以及最终用户的需求,创造尽可能大的有形和无形效益。
Modern architectural phase scheme to its backout so quality standard, and meet the they can maintain the most tan items should be planned, coordinated and controlled from its prothat they can be accomplished successfully, reach the engineering demand of the investor, proprietor and consumer. In this case, gible and intangible benefits.
出处
《淮海工学院学报(自然科学版)》
CAS
2006年第2期71-74,共4页
Journal of Huaihai Institute of Technology:Natural Sciences Edition
关键词
全寿命
成本
控制
full life span
cost
control