摘要
结合轨道交通8号线复兴路站-淮海路站区间隧道与已建电力顶管隧道的空间位置关系,分析地铁盾构推进对相邻已建电力顶管隧道的影响,提出为减少这种不利影响而应采取的预防控制措施。
The article illustrates the effect of the subway shield driving on the adjacent existing power pipe-jacking tunnel,based on the space relation between the interval tunnel(Fuxing road~Huaihai road) of Shanghai Rail Transit Line No.8 and the power tunnel.And it proposes the control measures to reduce the unfavorable impacts.
出处
《地下工程与隧道》
2005年第4期41-42,共2页
Underground Engineering and Tunnels