摘要
笔者详细介绍了东门关公路隧道出口软弱围岩段新奥法施工的现场监控量测工作.通过对各施工阶段的监测与分析,配合和指导其施工实践.
The site monitoring was made during the exit construction of Dongmenguan highway ttmnel. By means of the monitoring and detailed analysis for each construction stage,feedback controlling desin is realized and the NATM construction is controlled.
出处
《重庆交通学院学报》
2006年第1期24-26,共3页
Journal of Chongqing Jiaotong University
关键词
东门关公路隧道
新奥法
监控量测
Dongmenguan highway tunnel
new austrian tunnelling method(NATM)
eonstruction monitoring