7Sakurai S,,Akutagawa S,Takeuchi D,Shinji M,Shimizu N.Back analysis for tunnel engineering as a modern observational method. Tunnelling andUnderground Space Technology . 2003 被引量:1
8Lee G T K,Ng C W W.The effects of advancing open face tunneling on an existing loaded pile. Journal of Geothechnical and Geoenvironmental Engineering . 2005 被引量:1
9Yang L, Zhang K, Wang Y. Back analysis of initial rock stresses and time-dependent parameters[J]. Int. J. Rock Mech. Min. Sci. &Geomech. Abstr., 1996, 33(6): 641-645. 被引量:1
10Marcio Muniz de Farias,Alvaro Henrique Moraes Junior,Andre Pacheco de Assis.Displacement control in tunnels excavated by the NATM:3-D numerical simulations. Tunnelling and Underground Space Technology . 2004 被引量:1