不同支付方式下的多模式项目支付进度问题研究 被引量:3

Study on Multi-Mode Project Payment Scheduling Problems under Different Payment Rules
下载PDF
导出
摘要 本文首先明确了研究的假设条件并对多模式项目支付进度问题(MPPSP)进行了界定;随后从承包商和业主两个角度构建了MPPSP的基本优化模型;鉴于支付方式的不同,将基本优化模型扩展为基于进展、基于时间和基于费用的MPPSP优化模型;最后,通过对一个算例的计算分析,讨论了支付方式对最优支付进度安排及合同双方收益的影响。 The assumptions of the study are given and multi-mode project payment scheduling problem (MPP- SP) is identified firstly. Then basic optimal models of MPPSP are constructed from contractor's and client's viewpoints respectively. In light of different payment rules, the models are extended to progress-based, timebased and cost-based ones further. Finally, the influence of payment rules on optimal payment schedules and NPV of the both sides of contracts is discussed through calculation and analysis of an instance.
出处 《运筹与管理》 CSCD 2005年第5期7-12,29,共7页 Operations Research and Management Science
基金 国家自然科学基金重大项目(59990470-4)
关键词 项目管理 支付进度安排 支付方式 活动执行模式 优化模型 project management payment scheduling payment rules performing mode of activity optimalmodel
  • 相关文献

参考文献8

  • 1Tavares L V. A review of the contribution of operational research to project management[J]. European Journal of Operational Research, 2002, 136 (1): 1-18. 被引量:1
  • 2Dayanand N, Padman R. On modeling progress payments in project networks[J]. Journal of the Operational Research Society, 1997, 48(9): 906-918. 被引量:1
  • 3Dayanand N, Padman R. Project contracts and payments schedules: the client's problem[J]. Management Science, 2001, 47(12): 1654-1667. 被引量:1
  • 4Dayanand N, Padman R. A two stage search heuristic for scheduling payments in projects[J]. Annals of Operation Research, 2001, 102(1): 197-220. 被引量:1
  • 5Talbot B. Resource-constrained project scheduling with time-resource tradeoffs: The non-preemptive case[J]. Management Science, 1982, 28(10): 1197-1210. 被引量:1
  • 6Fisk R. Construction project administration[M]. Englewood Cliffs, NJ, Prentice-Hall, 1992. 被引量:1
  • 7Elmaghraby S. Activity nets: A guided tour through some recent developments[J]. European Journal of Operational Research, 1995, 82(3): 383-408 被引量:1
  • 8何正文..多模式项目支付进度的整合优化研究[D].西安交通大学,2004:

同被引文献82

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部