摘要
针对整个1∶50 000 DLG生产过程,从优化作业流程、强化项目管理、加强过程检查的角度出发,分析了各个环节的特点和1∶50 000 DLG相关的技术要求,通过分级管理来优化分工,编制检查程序来控制关键的过程,探讨数据入库方面的关键环节,最终合理、高效地完成整个项目的工作。
Aiming at the whole production process of 1:50 000 DLG,the paper analyzes the special points and related technical requirement of 1:50 000 DLG productions, including optimizing the operating flow, enhancing the project management and improving the process of production aspects,It also proposes the optimizing division of labor by departments at various levels,controlling the key process by compiling programs and studying the major linkages of putting data into database so as to realize the total work reasonably and efficiently.
出处
《测绘与空间地理信息》
2005年第4期55-56,共2页
Geomatics & Spatial Information Technology
关键词
作业流程
项目管理
分级管理
检查程序
operating flow
project management
management at different level
inspecting programme