4Martin Fischer,Florian Aalami.Scheduling with computer-interpretable construction method models[J].Journal of Construction Engineering and Management,1996,122(4):337-347. 被引量:1
5Ory Shaked,Abraham Warszawski.Knowledge-based system for construction planning of high-rise buildings[J].Journal of Construction Engineering and Management,1995,121 (2):172-182. 被引量:1
7Kletz T. HAZOP and HAZON: Identifying and assessing process industry hazards[M]. Third Edition: Rugby, Warwickshire CV21 3HQ, UK: Insti2 tution of Chemical Engineers, 1992. 被引量:1
9Kletz T. HAZOP and HAZON: Identifying and assessing process industry hazards[M]. Third Edition: Rugby, Warwickshire CV21 3HQ, UK: Insti2 tution of Chemical Engineers, 1992. 被引量:1