摘要
马钢某厂新上的40/10t吊车,性能不达要求,需要整改。介绍了三种可选择的整改方案和最终选择的方案。
The capability of 40/10 ton crane which was used newly by Ma steel cold plank failed to reach the given requirement to be improved. Here are three ways to be chosen and final proposal.
出处
《安徽冶金科技职业学院学报》
2005年第2期32-35,共4页
Journal of Anhui Vocational College of Metallurgy and Technology
关键词
40/10t吊车
整改方案
桥架重新设计
40/10 ton crane
the proposal to be improved
bridge shelf redesigned