概述广东省脱硫项目的建设情况和沙角A电厂5号机组第一台300MW燃煤机组采用湿法脱硫投产后所取得的成效,详细分析5号机组烟气脱硫装置氧化风系统及脱水系统的设计和控制优化措施,对存在的问题提出建议。
The article gives a brief introduction on Desulfurization Projects construction in Shajiao A Power Plant,and summarizes the effect of the first wet desulfurization device for a 300MW coal - fired unit,i. e Unit 5, of Shajiao A Power Plant. It focuses on analyzing the dewatering system taken to optimize the design and control. Meanwhile the article puts forwatd some suggestions to resolve the existing problems.
出处
《自动化与仪器仪表》
2005年第3期17-19,25,共4页
Automation & Instrumentation