期刊文献+

全断面针梁式钢模台车在天生桥二级水电站Ⅲ号引水隧洞施工中的应用 被引量:2

Application of Steel-mould Stair Vehicles of Whole-cross Needle Bridgein No.3 Water-intake Tunnel of Tianshengqiao Second-step Hydropower Station
下载PDF
导出
摘要 针对天生桥二级水电站Ⅲ号引水隧洞工程的特点,采用自制的全断面针梁式钢模台车施工,介绍了钢模台车的性能,详细论述了钢模台车各道工序施工过程和操作方式,提出了在操作过程中出现问题的解决办法和防治措施.钢模台车的应用提高了施工效率,保证了施工质量. In accordance with construction feature of the third water_intake tunnel in Tianshengqiao second_step hydropower station,self_made steel_mould stair vehicles of whole_cross needle bridge are adopted.The performance of steel_mould stair vehicles and its each construction process and operating patterns are discussed.Then the ways of solving problems in the course and preventive and management meatures are put forward.Its application improves construction efficiency and guarantee quality.
出处 《华北水利水电学院学报》 2005年第2期22-24,共3页 North China Institute of Water Conservancy and Hydroelectric Power
关键词 混凝土衬砌 全断面针梁式钢模台车 Ⅲ号引水隧洞 天生桥二级水电站 concrete lining steel_mould stair vehicle of whole_cross needle bridge No.3 water_intake tunnel Tianshengqiao second_step hydropower station
  • 相关文献

参考文献3

共引文献10

同被引文献11

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部