期刊文献+

调整时间与工序顺序相关的Job Shop调度优化方法研究 被引量:4

Study on Optimization Method for Job Shop Scheduling with Sequence-dependent Setup
下载PDF
导出
摘要 以多目标多约束Job Shop调度问题为背景,考虑工序调整、作业相似性等特点,利用成组技术和人工智能树,提出了与工序排序有关的调整时间描述方法及其调度规则,给出了此问题的混合整数规划模型,并构造了基于生物免疫机理的调度算法以提高求解此类问题的效果。介绍了保证抗体的多样性和有效性的基于自然数的抗体编码方法和基于抗体浓度的抗体激增和抑制策略。用毛纺后整理车间的一个调度实例和La31 案例证明了免疫算法用于求解复杂生产调度问题的速度和效果。 A Job Shop scheduling problem with multi-objectives and multi-constraints was studied, while the setup time of sequence and similarity of jobs were considered. The describing method and scheduling rules of sequence-dependent setup time were proposed by using group technology and artificial intelligence tree. A mixed integer programming model of the problem was presented, along with a scheduling algorithm based on biologic immunity mechanism was constructed to improve effect-ness of solving the problem. The array of natural number was used to form the antibody to ensure the diversity and validity of the antibody. And the proliferation and suppress strategy based on the deepness of antibody was introduced. Finally, the rapidity and results of immune algorithm in solving the problem is testified by an illustration in the collating shop of wool spinning industry and instance La31.
机构地区 东华大学
出处 《中国机械工程》 EI CAS CSCD 北大核心 2005年第10期914-918,共5页 China Mechanical Engineering
基金 国家自然科学基金资助项目(70371040)
关键词 JOB Shop调度 基于工序排序的调整时间 优化方法 生物免疫机理 Job Shop scheduling, sequence-dependent setup time, optimization method, biologic immunity mechanism
  • 相关文献

参考文献10

  • 1李蓓智,杨建国,丁惠敏.基于生物免疫机理的智能调度系统建模与仿真[J].计算机集成制造系统-CIMS,2002,8(6):446-450. 被引量:15
  • 2杨建国,丁慧敏,李蓓智.解决多目标Flow-shop问题的生物免疫调度算法[J].机械设计与研究,2002,18(4):28-30. 被引量:8
  • 3Garey E L, Johnson D S, Sethi R.The Complexity of Flowshop and Jobshop Scheduling.Maths.Ops.Res.,1976, 1:117~129. 被引量:1
  • 4Kim S, Bobrowski P.Impact of Sequence-dependent Setup Time on Jobshop Scheduling Performance.International Journal of Production Research,1992,32:1503~1520. 被引量:1
  • 5Aanen E, Gaalman C, Nawijn W.A Scheduling Approach for a Flexible Manufacturing System.International Journal of Production Research,1993,31:2369~2385. 被引量:1
  • 6Zhou C, Egbelu P J.Scheduling in a Manufacturing Shop with Sequence-dependent Setups.Robotics and Computer Integrated Manufacturing,1989,5:73~81. 被引量:1
  • 7Choi I C, Korkmaz O.Job Shop Scheduling with Separable Sequence Dependent Setups.Annals of Operations Research,1997,70:155~170. 被引量:1
  • 8周泓,张惠民.求解含调整时间排序问题的混合遗传算法[J].航空学报,2001,22(2):180-183. 被引量:4
  • 9方远..复合代理体及其在企业管理信息系统中的应用研究[D].东华大学,2001:
  • 10Lawrence S.Resource Constrained Project Scheduling:an Experimental Investigation of Heuristic Scheduling Techniques (Supplement).Pittsburgh, Pennsylvania:Graduate School of Industrial Administration, Carnegie-Mellon University,1984. 被引量:1

二级参考文献5

共引文献21

同被引文献27

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部