摘要
结合古浪河大桥钢梁工程实例 ,就其钢梁总体施工方案的布置进行了介绍 ,从钢梁拼装、上下滑道布置、拖拉架设施工等方面 ,阐述了具体的施工工艺措施 ,并总结了结合梁拖拉的施工体会。
Taking the steel beam work of Gulanghe bridge as example the arrangement of general construction plan is introduced from steel beam assembly, pulling and erection construction and other aspects. Concrete technical measures are presented as well as construction experiences of steel-concrete composite beam.
出处
《山西建筑》
2005年第4期84-85,共2页
Shanxi Architecture
关键词
现浇混凝土
结合梁
拖拉
cast-in-site concrete, steel-concrete composite beam, pulling