结合小榄水厂设计规模为10×104m3/d的扩建工程,对V型滤池在施工中存在的问题进行了探讨,并提出了改进措施,使V型滤池的运行更加安全可靠。
For the expansion project with design capacity of 10×10~4 m^3/d in Xiaolan Water Works, the problem in the construction of V-filter was discussed, and the modification measures were proposed, so that the V-filter could operate more safely and reliably.
出处
《中国给水排水》
CAS
CSCD
北大核心
2005年第1期96-97,共2页
China Water & Wastewater
关键词
Ⅴ型滤池
反冲洗
施工
V-filter
backwashing
construction