摘要
本文详细介绍了小浪底进口高边坡国内标锚索施工中的具体技术要求 ,指出锚索施工过程主要包括造孔、编索、放索、灌浆、张拉与量测、封孔。
The concrete technical requirements for the entrance high slope of Xiaolangdi Project in domestic anchor construction are intruduced in detail.The anchors construction mainly includes drilling,organizing cables, sending cables, anchor grouting,tensioning and measuring,proctective hood.The quality of anchor construction is the key to the slope support.