深溪沟电站泄洪冲沙洞进口高边坡稳定性分析 被引量:1

High slope stability analysis of flood and sediment releasing tunnel outlet of Shenxigou Hydropower Station
下载PDF
导出
摘要 深溪沟水电站泄洪冲沙洞进水口自然边坡高陡,场地狭窄,岩体卸荷强烈,致使进口闸室段结构布置困难。边坡开挖对后坡卸荷岩体形成切脚作用,施工开挖爆破问题突出。通过对边坡地质条件进行调查研究,分析其工程地质特征,定量计算其稳定性系数,评价其稳定性,最后对进口闸室结构进行优化,不仅达到了减少投资、缩短工期的目的,而且降低了安全风险。 The natural slope at outlet of flood and sediment releasing tunnel of Shenxigou Hydropower Station is high and steep, and the construction site is narrow with strung unloading, therefore, the structural layout of entrance sluice chamber is difficult. After the entrance slope was excavated, the slope foot support role was lost, resulting in difficulty of blasting. Through investigation of the geological condition, we analyzed its geological features and calculated stability index quantitatively to evaluate its stability. The structure of tunnel entrancc chamber was optimized resulting in lower investment, construction period, and construction risk.
出处 《人民长江》 北大核心 2010年第18期76-78,共3页 Yangtze River
关键词 泄洪冲沙洞 高陡边坡 稳定性 深溪沟水电站 flood and sediment releasing tunnel high and steep slope stability Shenxigou Hydropower Station
  • 相关文献

同被引文献1

  • 1张倬元 王士天 王兰生.工程地质分析原理[M].北京:地质出版社,1990.. 被引量:17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部