摘要
主要介绍了利用步进式液压顶推系统和座底半潜驳出运沉箱的施工工艺及其在东莞预制场的成功运用。
This paper introduces a new method for launching caissons with semi-submerged barge of bottom sitting and step-type hydraulic push system, which has been adopted in Dongguan Caisson Prefabrication Yard successfully.
出处
《中国港湾建设》
北大核心
2004年第5期16-19,共4页
China Harbour Engineering
关键词
步进式液压顶推系统
座底半潜驳
沉箱
出运
step-type hydraulic push system
bottom-sitting semi-submerged barge
caisson
lauching.