摘要
针对秦沈客运专线新线一次性铺设跨区间无缝线路的特点 ,通过对道床状态各项指标的综合测试 ,在系统分析研究的基础上 ,就跨区间无缝线路道床状态指标的确定。
A comprehensive test was made of various indices concerning track bed status, and systematic analysis and researches were conducted. Rational recommendations were raised with respect to the determination of track bed status indices and construction control.
出处
《铁道标准设计》
2004年第9期18-20,共3页
Railway Standard Design
关键词
秦沈客运专线
道床状态
一次性铺设
跨区间无缝线路
Qinhuangdao-Shenyang (QinShen) Passenger Dedicated Railway, one-time laying, cross sectional jointless track, track bed status, index