龙滩水电站施工总布置时空协调设计 被引量:2

The space-time continuum design for the general layout of Longtan Hydropower Station
下载PDF
导出
摘要 做好施工总布置时空协调设计,满足工程建设期各标段在时间和空间上的布置要求,对节省工程建设投资、加快施工进度有着重要作用,是大中型水电工程施工规划设计中举足轻重的工作。龙滩水电站工程通过利用工程弃渣和统一调配使用场地,实现了狭窄坝区的施工总布置。 Taking concert steps in general layout and meeting the demands of space-time continuum layout during construction period in different contractors would play a decisive role in the construction plan of large-and medium-sized hydroelectric projects. and would be important for cutting down investment and speeding up project progress. It realized rational general layout in narrow area by making use of abandoned excavated materials and overall construction site allocation in Longtan Hydropower Station.
出处 《水力发电》 北大核心 2004年第6期20-22,共3页 Water Power
关键词 施工总布置 施工场地 时空协调 弃渣调配 龙滩水电站 general layout construction site space-time continuum abandoned excavated materials allocation Longtan Hydropower Station
  • 相关文献

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部