摘要
做好施工总布置时空协调设计,满足工程建设期各标段在时间和空间上的布置要求,对节省工程建设投资、加快施工进度有着重要作用,是大中型水电工程施工规划设计中举足轻重的工作。龙滩水电站工程通过利用工程弃渣和统一调配使用场地,实现了狭窄坝区的施工总布置。
Taking concert steps in general layout and meeting the demands of space-time continuum layout during construction period in different contractors would play a decisive role in the construction plan of large-and medium-sized hydroelectric projects. and would be important for cutting down investment and speeding up project progress. It realized rational general layout in narrow area by making use of abandoned excavated materials and overall construction site allocation in Longtan Hydropower Station.
出处
《水力发电》
北大核心
2004年第6期20-22,共3页
Water Power
关键词
施工总布置
施工场地
时空协调
弃渣调配
龙滩水电站
general layout
construction site
space-time continuum
abandoned excavated materials allocation
Longtan Hydropower Station