摘要
针对顺和煤矿2106综采工作面设计问题,对2106工作面进行了优化设计,同时对工作面回采过程中长度进行了详细计算,确定了支架预放位置,研究成果对类似工程条件工作面具有参考意义。
According to Shunhe coal mine for 2106 fully mechanized coal face design issues for 2106 face optimized design,while the mining face length during a detailed calculations to determine the position of the stent pre-release research results on similar projects face in a reference condition significance.