受三峡水库水位影响,水位落差影响施工安全,水中墩基础施工采用设置固定平台、水上浮动钻孔平台,解决了水上施工安全、材料运输等问题。根据实际施工经验,重点介绍水上钻孔平台的设计及应用。
Water level difference has effect on construction safety caused by the Three Gorges Reservoir. Fixed platform was adopted in pier foundation construction and floating platform for boring was also adopted to solve the problems as construction safety and materials transportation. According to the construction experience,this paper mainly introduced the design and construction of floating platform for boring.
出处
《施工技术》
CAS
北大核心
2013年第S2期354-356,共3页
Construction Technology
关键词
基础
水上浮动平台
钻孔
施工技术
foundations
floating platform for boring
drilling