摘要
根据蒲石河抽水蓄能电站座环/蜗壳水压试验的特点,分析试验过程和试验要点,充分掌握座环/蜗壳水压试验的重点和难点,并对其进行总结,制定出一套可行的试验方案,通过采取一些技术措施,有效地解决了蜗壳水压试验中的技术难题。
Combined with the characteristic and process of spiral case hydraulic test in Pushihe pumped storage power station, this article concludes the key points of the test and gives a feasible test program. By means of particular technical measures, the technical problems in spiral case hydraulic test are effectively solved.
出处
《工程建设与设计》
2013年第S1期87-89,共3页
Construction & Design for Engineering
关键词
蓄能电站
蜗壳打压
保压混凝土浇注
试验
storage power station
spiral case pressuring
pressure holding concrete pouring
test