摘要
针对高掺量粉煤灰泡沫轻质土的轻质、可流动、及固化直立特性,采用过程控制的施工方法,并结合广明高速公路FD段新型轻质直立式路堤的施工情况,严格按照设计指标要求,从附属工程、设备要求、施工方式、湿密度、流值及气泡密度等方面开展控制,以期按质保量完成工程建设。
In accordance with the high-volume fly ash lightweight,flow and curing vertical characteristics,using the construction method of process control,combined with the construction of the new lightweight upright type embankment of Guang-Ming Highway FD section,strictly following the design requirements,the paper conducted the control from aspects such as auxiliary projects,equipment requirements,construction methods,wet density,flow value,and bubble density to complete the project construction quality.
基金
广东省交通运输厅科技计划项目(2010-02-005)