4Variga S, Chongrak P. Nitrogen mass balance and microbial analysis of constructed wetlands treating municipal landfill leachate [ J ]. Bioresource Technology, 2007, 98(3) : 565 - 570. 被引量:1
5Jeremy F, Dorin B, Kelly A R, et al. Nitrogen removal from domestic wastewater using the marshland upwelling system[J]. Ecological Engineering, 2006, 27( 1 ) : 22 - 36. 被引量:1
6IWA. Constructed wetlands for pollution control: processes, performance, design and operation. International Water Association Scientific and Technical Report No. 8 [ R]. London, UK: IWA Publishing, 2000. 被引量:1
7Breen P F, Chick A J. Root zone dynamics in constructed wetlands receiving wastewater: a comparison of vertical and horizontal flow systems[J]. Wat Sci Tech, 1999, 32(3) : 281 - 290. 被引量:1
8Rogers K H. Nitrogen Removal in Experimental Wetland Treatment System: Evidence for the Role of Aquatic Plants [ J]. Research Journal of WPCF, 1991, 63(7) : 934 - 941. 被引量:1
9Zhu T, Sikora F J. Ammonium and nitrate removal in vegetated and unvegetated gravel bed microcosm wetlands [J]. Wat Sci Tech, 1995, 32(3) : 219 - 228. 被引量:1
10Lin Ying-Feng, Jing Shuh-Ren, Wang Tze-Wen, et al. Effects of macrophytes and external carbon sources on nitrate removal from groundwater in constructed wetlands [ J]. Environmental Pollution, 2002, 119: 413- 420. 被引量:1