预切顶房柱采矿法在侯庄矿区的应用实践 被引量:3

Application Practice of Pre-truncating Crest Room-and-pillar Method at Houzhuang Mine
下载PDF
导出
摘要 侯庄分矿结合生产实践 ,设计采用预切顶房柱法开采缓倾斜中厚矿体。实践证明 ,预切顶房柱法具有采掘比小、贫化率低、回采高、工艺简单等优点 。 Combining with the production practice of Houzhuang mine, the pre truncating crest room and pillar method is designed and adopted to mine the gently dipping middle thick ore body. The practice has identified that pre truncating crest room and pillar method has features of small rate of excavation and recovering, low depletion rate, high percentage extraction, and simple technique etc. The method has decreased the mining cost greatly.
机构地区 山东金岭铁矿
出处 《山东冶金》 CAS 2002年第3期1-2,共2页 Shandong Metallurgy
关键词 预切顶房柱采矿法 缓倾斜中厚矿体 采掘比 贫化率 损失率 pre truncating crest room and pillar method gently dipping middle thick ore body rate of excavation and recovering depletion rate rate of wastage