1[1]John J McManus. Control in the OPT environment [ J ]. Production Engineer, 1987,7 - 8: 20 - 21. 被引量:1
2[2]Pisal Yenradee. Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory [J]. Computers Industrial Engineering, 1994,27 ( 1 - 4 ): 217 -220. 被引量:1
3[3]Thomas Corbett, Joao Mario Csillag. Analysis of the effects of seven drum- buffer- rope implementations [ J]. Production and Inventory Management Journal ,2001,3/4: 17 - 23. 被引量:1
4[4]Robert Lundrigan. What is this thing called OPT? [J]. Production and Inventory Management, 1986,2: 2 - 11. 被引量:1
5[5]F. Robert Jacobs. OPT uncovered: many production planning and scheduling concepts can be applied with or without the software [ J ]. Industrial Engineering, 1984,10: 32 - 34,36,38,41 - 42. 被引量:1
7[7]J Miltenburg. Comparing JIT, MRP and TOC, and embedding TOC into M RP [ J]. International Journal of Production Research, 1997,35(4) : 1147 - 1169. 被引量:1
4GUIDE V D R. Scheduling Using Drum-buffer-rope in a Remanufacturing Environment [ J ]. International Journal of Production Research, 1996,34 ( 4 ) : 1081 - 1091. 被引量:1
6M1LTENBURG J.Comparing JIT,MRP and TOC,and embedding TOC into MRP[J].International Journal of Production Research,1997,35(4);1147-1169. 被引量:1
7SCHRAGENHEIM Eli,RONEN Boaz.Drum-buffer-rope shopfloor control[J].Production and Inventory Management Journal,1990(3):18-22. 被引量:1
8RONENB,STARRMK.Synchronized manufacturing as in OPT:from practice to theory[J].Computers Industrial Engineering,1990,18(4):585-600. 被引量:1
9SCHRAGENHEIME,R0NENB.Buffer management:a diagnostictool for production control[J].Pro duction and Inventory Manage-ment Journal,1991,2(2):74-79. 被引量:1
10WUSY,JOHNSM,THOMASMG.A simulation analysis of the ef-fectiveness of Drum-Buffer-Rope scheduling in furniture manufac-turing[J].Computers Industrial Engineering,1994,26(4):757-764. 被引量:1