摘要 在满足区域间联络线族静态安全N-1约束的前提下,计及典型负荷模式和发电最大、最小模式,对大型互联电网的区域间极限传输容量(TTC)进行了分析,推导出了TTC计算的简化数学模型,说明了电网运行方式变化对TTC具有显著影响.依据系统实时运行数据以及预定的发电调整模式,以实际系统进行计算分析,结果表明本方法对提高区域间允许传输容量具有重要意义. The total transfer capability (TTC) over the interconnected transmission network was analyzed by taking typical load mode and most generation mode and least generation mode into account with the N-1 steady state security constraints of tie line group. A simple mathematic model was introduced and the significant influence on TTC was indicated. The case study was made at a practical system according to the real-time operation data and scheduled generation mode, and it is proved that the method is very effecti...
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2005年第S1期45-48,共4页 Journal of Shanghai Jiaotong University
关键词 电力系统运行 极限传输容量 N-1约束 静态安全分析 power system operation total transfer capability (TTC) N-1 restriction steady state security analysis
  • 相关文献

参考文献8

二级参考文献48

  • 1李国庆.基于连续型方法的大型互联电力系统区域间输电能力的研究[M].天津,天津大学,1998.. 被引量:3
  • 2刘肇旭 童建中.暂态稳定约束的电网供电能力的计算方法[J].中国电机工程学报,1987,7(3):18-23. 被引量:2
  • 3Available Transfer Capability Definition and Determination.North American Electric Reliability Council. 1996. 被引量:1
  • 4Chang R F, Tsai C Y, Su C L, et al. Method for Computing Probability Distributions of Available Transfer Capability. IEE Proceedings- Generation, Transmission and Distribution,2002, 149(4): 427~431. 被引量:1
  • 5Xia Feng, Meliopoulos A P S. A Methodology for Probabilistic Simultaneous Transfer Capability Analysis. IEEE Trans on Power Systems, 1996, 11(3), 1269~1278. 被引量:1
  • 6Mello J C O, Melo A C G, Granville S. Simultaneous Transfer Capability Assessment by Combining Interior Point Methods and Monte Carlo Simulation. IEEE Trans on Power Systems, 1997,12(2) : 736~742. 被引量:1
  • 7Rodrigues A B, Silva M G Da. Solution of Simultaneous Transfer Capability Problem by Means of Monte Carlo Simulation and Primal-dual Interior-point Method. In:Proceedings of International Conference on Power System Technology, Vol 2. 2000. 1047~1052. 被引量:1
  • 8IEEE Committee Report. IEEE Reliability Test System. IEEE Trans on Power Apparatus and Systems, 1979, 98(6): 2047~2054. 被引量:1
  • 9Ou Yan, Singh Chanan. Assessment of Available Transfer Capability and Margins. IEEE Trans on Power Systems, 2002,17(2):463~468. 被引量:1
  • 10Available transfer capability definitions and determination [R]. North American Electric Reliability Council (NERC), Princeton, NJ, June 1996. 被引量:1

共引文献237