摘要
The design lowest navigable water level is a primary index to the channel grade division.But differ- ent method can get different calculated result,and that even brings contradiction to decide the navigation grade.In this paper the differences between guaranteed rate method and guaranteed rate-frequency method on the fundamental concept of guaranteed rate and the calculated result are carried out.According to the theoreti- cal expression forms of the two methods,the reason leading to the difference is an...
The design lowest navigable water level is a primary index to the channel grade division.But differ- ent method can get different calculated result,and that even brings contradiction to decide the navigation grade.In this paper the differences between guaranteed rate method and guaranteed rate-frequency method on the fundamental concept of guaranteed rate and the calculated result are carried out.According to the theoreti- cal expression forms of the two methods,the reason leading to the difference is analy...
出处
《四川大学学报(工程科学版)》
EI
CAS
CSCD
北大核心
2005年第S1期118-123,共6页
Journal of Sichuan University (Engineering Science Edition)
基金
Supported by the National Key Basic Resarch and Development Plan (Grant 2003CB415200)