摘要 丰台站是我国第一座高速、普速双层车场上下平行重叠的特大型铁路站房,且地处北京市丰台区,周边环境复杂,与多个相邻标段同步实施,施工组织难度大。结合丰台站特点、难点,开展创新研究与应用,通过全生命周期BIM技术、BIM+智慧工地、钢结构全生命周期管理平台及绿色建造等核心技术应用,攻克施工技术难点,为丰台站建设保驾护航,同时也为类似复杂条件下大型站房施工管理提供借鉴。 Fengtai Station is China’s first extra-large railway station building that is with overlapped double-deck yards(for high speed and for conventional railways).Located in Fengtai District,Beijing and with complex surrounding conditions,it was constructed in parallel with several other contract sections nearby,making construction work much difficult.According to the characteristics of this station and the difficulties it is faced with,innovative research and application were carried out,and core technologies,such as full-life-cycle BIM,BIM+smart construction site,full-life-cycle steel structure management platform and green construction,were applied to tackle technical difficulties,thus ensuring the successful construction of the station and providing a reference for the management of large station buildings’construction under similar complex conditions.
作者 许慧 朱必成 董无穷 付大伟 XU Hui;ZHU Bicheng;DONG Wuqiong;FU Dawei(Fengtai Railway Station Directorate,China Railway Construction Engineering Group,Beijing 100071,China)
出处 《中国铁路》 2021年第S01期182-189,共8页 China Railway
关键词 丰台站 复杂环境 特大型站房 BIM技术 钢结构全生命周期 绿色建造 Fengtai Station complex surrounding conditions extra-large station building BIM full-life-cycle steel structure green construction
  • 相关文献

二级参考文献32

共引文献100

同被引文献11

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部