期刊文献+

面向全流程的车辆段上盖综合开发交通规划设计的实践

Practice of the Traffic Plan and Design in the Depot Comprehensive Development Based on the Whole Process
下载PDF
导出
摘要 面对日益增多且复杂的城市轨道交通车辆段上盖综合开发项目,以全流程的视角说明该类型项目中交通规划设计方面存在的问题,结合相关经验提出边界条件、道路布局、流线组织、交通设施等四大技术管控要点,并以广州镇龙车辆段上盖综合开发为例进行案例说明,以期为国内相关城市后续车辆段上盖综合开发的交通规划设计提供参考和借鉴。 In the face of an increasing number of complex urban rail transit depot comprehensive development projects,from the perspective of the whole process,the traffic plan and design problems in the projects are explained.Combined with related experience,the four major technical control points of boundary conditions,road layout,circulation organization and traffic facilities are proposed,and the Guangzhou Zhenlong depot comprehensive development is used as an example to illustrate,in order to provide a more practical reference for related development in the future times.
作者 陈立扬 陈春安 CHEN Liyang;CHEN Chunan(Guangzhou City Construction&Development Co.,Ltd,Guangzhou 510623,China;Yuexiu Property TOD Institute,Guangzhou 510623,China;Guangzhou Transport Planning Research Institute Co.,Ltd,Guangzhou 510030,China)
出处 《交通与运输》 2023年第S01期29-32,共4页 Traffic & Transportation
关键词 车辆段 综合开发 交通 TOD 全流程 Depot Comprehensive development Traffic TOD Whole process
  • 相关文献

二级参考文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部