摘要
面对日益增多且复杂的城市轨道交通车辆段上盖综合开发项目,以全流程的视角说明该类型项目中交通规划设计方面存在的问题,结合相关经验提出边界条件、道路布局、流线组织、交通设施等四大技术管控要点,并以广州镇龙车辆段上盖综合开发为例进行案例说明,以期为国内相关城市后续车辆段上盖综合开发的交通规划设计提供参考和借鉴。
In the face of an increasing number of complex urban rail transit depot comprehensive development projects,from the perspective of the whole process,the traffic plan and design problems in the projects are explained.Combined with related experience,the four major technical control points of boundary conditions,road layout,circulation organization and traffic facilities are proposed,and the Guangzhou Zhenlong depot comprehensive development is used as an example to illustrate,in order to provide a more practical reference for related development in the future times.
作者
陈立扬
陈春安
CHEN Liyang;CHEN Chunan(Guangzhou City Construction&Development Co.,Ltd,Guangzhou 510623,China;Yuexiu Property TOD Institute,Guangzhou 510623,China;Guangzhou Transport Planning Research Institute Co.,Ltd,Guangzhou 510030,China)
出处
《交通与运输》
2023年第S01期29-32,共4页
Traffic & Transportation
关键词
车辆段
综合开发
交通
TOD
全流程
Depot
Comprehensive development
Traffic
TOD
Whole process