Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new de...Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new developments in FMM technology and equipment in Chinese coal mines during past decades are introduced.The automatic FMM technology for thin seams,complete sets of FMM technology with ultra large shear height of 7 m for thick seams,complete sets of fully mechanized top coal caving technology with large shear height for ultra-thick seams of 20 m,complete sets of FMM technology for complex and difficult seams,including steeply inclined seams,soft coal seams with large inclination angle,and the mechanized filling mining technology and equipment are presented.Some typical case studies are also introduced.Finally,the existing problems with the FMM technology are discussed,and prospect of FMM technology and equipment applied in Chinese coal mines is put forward.展开更多
Under fully mechanized, large mining height top coal caving conditions, the shield beam slope angle of the support increases due to the enlargement of the top coal breaking and caving space. This results in a change o...Under fully mechanized, large mining height top coal caving conditions, the shield beam slope angle of the support increases due to the enlargement of the top coal breaking and caving space. This results in a change of the caving window location and dimensions and, therefore, the granular coal-gangue movement and flows provide new characteristics during top coal caving. The main inferences we draw are as follows. Firstly, after shifting the supports, the caved top coal layer line and the coal gangue boundary line become steeper and are clearly larger than those under common mining heights. Secondly, during the top coal caving procedure, the speed of the coal-gangue flow increases and at the same drawing interval, the distance between the coal-gangue boundary line and the top beam end is reduced. Thirdly, affected by the drawing ratio, the slope angle of the shield beam and the dimensions of the caving window, it is easy to mix the gangue. A rational drawing interval will cause the coal-gangue boundary line to be slightly behind the down tail boom lower boundary. This rational drawing interval under conditions of large mining heights has been analyzed and determined.展开更多
Large cutting height fully mechanized top-coal caving is a new mining method that improves recovery ratio and single-pass production. It also allows safe and efficient mining. A rational cutting height is one key para...Large cutting height fully mechanized top-coal caving is a new mining method that improves recovery ratio and single-pass production. It also allows safe and efficient mining. A rational cutting height is one key parameter of this technique. Numerical simulation and a granular-media model experiment were used to analyze the effect of cutting height on the rock pressure of a fully mechanized top-coal caving work face. The recovery ratio was also studied. As the cutting height increases the top-coal thickness is reduced. Changing the ratio of cutting to drawing height intensifies the face pressure and the top-coal shattering. A maximum cutting height exists under a given set of conditions due to issues with surrounding rock-mass control. An increase in cutting height makes the top-coal cave better and the recovery ratio when drawing top-coal is then improved. A method of adjusting the face rock pressure is presented. Changing the cutting to drawing height ratio is the technique used to control face rock pressure. The recovery ratio when cutting coal exceeds that when caving top-coal so the face recovery ratio may be improved by over sizing the cutting height and increasing the top-coal drawing ratio. An optimum ratio of cutting to drawing height exists that maximizes the face recovery ratio. A rational cutting height is determined by comprehensively considering the surrounding rock-mass control and the recovery ratio. At the same time increasing the cutting height can improve single pass mining during fully mechanized top-coal caving.展开更多
针对虎峰煤业2号煤层开采过程中存在大量的空巷、采空区及遗留煤柱,复采工作面矿业显现复杂,围岩控制难度大,工作面煤壁片帮大的问题,采用数值模拟的方法,对复采工作面通过不同宽度的残留煤柱和不同跨度采空区时工作面围岩破坏范围、应...针对虎峰煤业2号煤层开采过程中存在大量的空巷、采空区及遗留煤柱,复采工作面矿业显现复杂,围岩控制难度大,工作面煤壁片帮大的问题,采用数值模拟的方法,对复采工作面通过不同宽度的残留煤柱和不同跨度采空区时工作面围岩破坏范围、应力分布及工作面煤壁水平位移进行分析,从而确定合理的采高,认为工作面采高不宜超过3.0 m, 2.5 m以内最佳。展开更多
Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order...Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.展开更多
文摘Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new developments in FMM technology and equipment in Chinese coal mines during past decades are introduced.The automatic FMM technology for thin seams,complete sets of FMM technology with ultra large shear height of 7 m for thick seams,complete sets of fully mechanized top coal caving technology with large shear height for ultra-thick seams of 20 m,complete sets of FMM technology for complex and difficult seams,including steeply inclined seams,soft coal seams with large inclination angle,and the mechanized filling mining technology and equipment are presented.Some typical case studies are also introduced.Finally,the existing problems with the FMM technology are discussed,and prospect of FMM technology and equipment applied in Chinese coal mines is put forward.
基金Project 50774079 supported by the National Natural Science Foundation of China
文摘Under fully mechanized, large mining height top coal caving conditions, the shield beam slope angle of the support increases due to the enlargement of the top coal breaking and caving space. This results in a change of the caving window location and dimensions and, therefore, the granular coal-gangue movement and flows provide new characteristics during top coal caving. The main inferences we draw are as follows. Firstly, after shifting the supports, the caved top coal layer line and the coal gangue boundary line become steeper and are clearly larger than those under common mining heights. Secondly, during the top coal caving procedure, the speed of the coal-gangue flow increases and at the same drawing interval, the distance between the coal-gangue boundary line and the top beam end is reduced. Thirdly, affected by the drawing ratio, the slope angle of the shield beam and the dimensions of the caving window, it is easy to mix the gangue. A rational drawing interval will cause the coal-gangue boundary line to be slightly behind the down tail boom lower boundary. This rational drawing interval under conditions of large mining heights has been analyzed and determined.
基金Financial support for this work, provided by the National Basic Research Program of China (No.2007CB209400)the National Natural Science Foundation of China (No.51004104)
文摘Large cutting height fully mechanized top-coal caving is a new mining method that improves recovery ratio and single-pass production. It also allows safe and efficient mining. A rational cutting height is one key parameter of this technique. Numerical simulation and a granular-media model experiment were used to analyze the effect of cutting height on the rock pressure of a fully mechanized top-coal caving work face. The recovery ratio was also studied. As the cutting height increases the top-coal thickness is reduced. Changing the ratio of cutting to drawing height intensifies the face pressure and the top-coal shattering. A maximum cutting height exists under a given set of conditions due to issues with surrounding rock-mass control. An increase in cutting height makes the top-coal cave better and the recovery ratio when drawing top-coal is then improved. A method of adjusting the face rock pressure is presented. Changing the cutting to drawing height ratio is the technique used to control face rock pressure. The recovery ratio when cutting coal exceeds that when caving top-coal so the face recovery ratio may be improved by over sizing the cutting height and increasing the top-coal drawing ratio. An optimum ratio of cutting to drawing height exists that maximizes the face recovery ratio. A rational cutting height is determined by comprehensively considering the surrounding rock-mass control and the recovery ratio. At the same time increasing the cutting height can improve single pass mining during fully mechanized top-coal caving.
文摘针对虎峰煤业2号煤层开采过程中存在大量的空巷、采空区及遗留煤柱,复采工作面矿业显现复杂,围岩控制难度大,工作面煤壁片帮大的问题,采用数值模拟的方法,对复采工作面通过不同宽度的残留煤柱和不同跨度采空区时工作面围岩破坏范围、应力分布及工作面煤壁水平位移进行分析,从而确定合理的采高,认为工作面采高不宜超过3.0 m, 2.5 m以内最佳。
文摘Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.