In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants m...In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants meet the standard in priority and saving expenditure on pollution control. With the principle of reducing sewage from combined sewage pumping station and heavily polluted initial rainwater, a mathematical multiobjective planning model was constructed for rain sewage pollution control in flood season, and one scenic river in a northern city was taken for simulation example. The results show that: the optimization result meets the requirements of planning, among which, sewage reduction from the combined pumping station accounts for 17.38% in the total reduction of rain sewage, and the reduction in the heavily polluted rain water accounts for 77.24% in the total reduction of rainwater pumping station. The planning scheme can provide theoretical basis for pollution control of scenic river in flood season, and for rational reconstruction and layout of outfalls along two banks of the river.展开更多
The function of estuary wetland on hydrological adjustment and flooding control is studied in this paper. It is estimated that the evapotranspiration in the reed field during growth season(June to October) is 722.9 mm...The function of estuary wetland on hydrological adjustment and flooding control is studied in this paper. It is estimated that the evapotranspiration in the reed field during growth season(June to October) is 722.9 mm, which is 37.5% higher than large water body(E 601∶525.9 mm). The water replacement rate in the reed field can reach 95% only when the rains continuously for 11 days and the precipitation reached 912 mm. For the water balance in the paddy field, the total water requirement ranges between 1920 and 1860 mm, among which, 31% is from precipitation, and the left is provided by reservoirs. The water usage efficiency is 0.35 at present productivity. Based on the landscape characteristics and functionalities on flooding control, 5 functional zones are designed for the Liaohe Delta: key protected area; underground storage area; flooding discharge area; flood diversion area in emergency; and flood control drainage area.展开更多
基金Project supported by the National Natural Science Foundation of China (Grant No. 50178046)the Science and Technology Innovation Special Foundation of Tianjin (GrantNo.06FZZDSH00900).
文摘In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants meet the standard in priority and saving expenditure on pollution control. With the principle of reducing sewage from combined sewage pumping station and heavily polluted initial rainwater, a mathematical multiobjective planning model was constructed for rain sewage pollution control in flood season, and one scenic river in a northern city was taken for simulation example. The results show that: the optimization result meets the requirements of planning, among which, sewage reduction from the combined pumping station accounts for 17.38% in the total reduction of rain sewage, and the reduction in the heavily polluted rain water accounts for 77.24% in the total reduction of rainwater pumping station. The planning scheme can provide theoretical basis for pollution control of scenic river in flood season, and for rational reconstruction and layout of outfalls along two banks of the river.
文摘The function of estuary wetland on hydrological adjustment and flooding control is studied in this paper. It is estimated that the evapotranspiration in the reed field during growth season(June to October) is 722.9 mm, which is 37.5% higher than large water body(E 601∶525.9 mm). The water replacement rate in the reed field can reach 95% only when the rains continuously for 11 days and the precipitation reached 912 mm. For the water balance in the paddy field, the total water requirement ranges between 1920 and 1860 mm, among which, 31% is from precipitation, and the left is provided by reservoirs. The water usage efficiency is 0.35 at present productivity. Based on the landscape characteristics and functionalities on flooding control, 5 functional zones are designed for the Liaohe Delta: key protected area; underground storage area; flooding discharge area; flood diversion area in emergency; and flood control drainage area.