The 5G radio access network (RAN) architectm'e is supposed to be split into the central unit (CU) and the distributed unit (DU) in order to support more flexible transport networks and provide enhanced user exp...The 5G radio access network (RAN) architectm'e is supposed to be split into the central unit (CU) and the distributed unit (DU) in order to support more flexible transport networks and provide enhanced user experience. However, such functional split may also introduce some new technical issues. In this pa- per, we study the data fast retransmission issue introduced by this functional split in different scenarios and solutions are provided to handle this issue. With the fast data retransmis- sion mechanism proposed in this paper, the retransmitted da- ta packets could be identified and handled with high priority. In this way, the data delivery between the CU and DU in 5G RAN is assured.展开更多
Phasor Measurement Units(PMUs)provide Global Positioning System(GPS)time-stamped synchronized measurements of voltage and current with the phase angle of the system at certain points along with the grid system.Those s...Phasor Measurement Units(PMUs)provide Global Positioning System(GPS)time-stamped synchronized measurements of voltage and current with the phase angle of the system at certain points along with the grid system.Those synchronized data measurements are extracted in the form of amplitude and phase from various locations of the power grid to monitor and control the power system condition.A PMU device is a crucial part of the power equipment in terms of the cost and operative point of view.However,such ongoing development and improvement to PMUs’principal work are essential to the network operators to enhance the grid quality and the operating expenses.This paper introduces a proposed method that led to lowcost and less complex techniques to optimize the performance of PMU using Second-Order Kalman Filter.It is based on the Asyncrhophasor technique resulting in a phase error minimization when receiving the signal from an access point or from the main access point.The MATLAB model has been created to implement the proposed method in the presence of Gaussian and non-Gaussian.The results have shown the proposed method which is Second-Order Kalman Filter outperforms the existing model.The results were tested usingMean Square Error(MSE).The proposed Second-Order Kalman Filter method has been replaced with a synchronization unit into thePMUstructure to clarify the significance of the proposed new PMU.展开更多
Due to the high penetration of renewable distributed generation(RDG),many issues have become conspicuous during the intentional island operation such as the power mismatch of load shedding during the transition proces...Due to the high penetration of renewable distributed generation(RDG),many issues have become conspicuous during the intentional island operation such as the power mismatch of load shedding during the transition process and the power imbalance during the restoration process.In this paper,a phase measurement unit(PMU)based online load shedding strategy and a conservation voltage reduction(CVR)based multi-period restoration strategy are proposed for the intentional island with RDG.The proposed load shedding strategy,which is driven by the blackout event,consists of the load shedding optimization and correction table.Before the occurrence of the large-scale blackout,the load shedding optimization is solved periodically to obtain the optimal load shedding plan,which meets the dynamic and steady constraints.When the blackout occurs,the correction table updated in real time based on the PMU data is used to modify the load shedding plan to eliminate the power mismatch caused by the fluctuation of RDG.After the system transits to the intentional island seamlessly,multi-period restoration plans are generated to optimize the restoration performance while maintaining power balance until the main grid is repaired.Besides,CVR technology is implemented to restore more loads by regulating load demand.The proposed load shedding optimization and restoration optimization are linearized to mixed-integer quadratic constraint programming(MIQCP)models.The effectiveness of the proposed strategies is verified with the modified IEEE 33-node system on the real-time digital simulation(RTDS)platform.展开更多
A remote antenna unit (RAU) selection model is presented, and two kinds of handoffs, intra-cell handoff (HO) and inter-cell HO, are defined in distributed mobile communications systems (DAS). After that, an inte...A remote antenna unit (RAU) selection model is presented, and two kinds of handoffs, intra-cell handoff (HO) and inter-cell HO, are defined in distributed mobile communications systems (DAS). After that, an inter-cell HO model is proposed, in which the average power of the active set (AS) is used to predict the position of the mobile station (MS). The total power of the AS and the handoff set (HOS) are utilized to determine whether an inter-cell HO is necessary. Furthermore, the relationship between HO parameters and performance metrics is studied in detail based on RAU selection. Simulation results show that both the intra-cell HO and the inter-cell HO can achieve oerfect performance by aoprooriate settings of HO parameters.展开更多
文摘The 5G radio access network (RAN) architectm'e is supposed to be split into the central unit (CU) and the distributed unit (DU) in order to support more flexible transport networks and provide enhanced user experience. However, such functional split may also introduce some new technical issues. In this pa- per, we study the data fast retransmission issue introduced by this functional split in different scenarios and solutions are provided to handle this issue. With the fast data retransmis- sion mechanism proposed in this paper, the retransmitted da- ta packets could be identified and handled with high priority. In this way, the data delivery between the CU and DU in 5G RAN is assured.
文摘Phasor Measurement Units(PMUs)provide Global Positioning System(GPS)time-stamped synchronized measurements of voltage and current with the phase angle of the system at certain points along with the grid system.Those synchronized data measurements are extracted in the form of amplitude and phase from various locations of the power grid to monitor and control the power system condition.A PMU device is a crucial part of the power equipment in terms of the cost and operative point of view.However,such ongoing development and improvement to PMUs’principal work are essential to the network operators to enhance the grid quality and the operating expenses.This paper introduces a proposed method that led to lowcost and less complex techniques to optimize the performance of PMU using Second-Order Kalman Filter.It is based on the Asyncrhophasor technique resulting in a phase error minimization when receiving the signal from an access point or from the main access point.The MATLAB model has been created to implement the proposed method in the presence of Gaussian and non-Gaussian.The results have shown the proposed method which is Second-Order Kalman Filter outperforms the existing model.The results were tested usingMean Square Error(MSE).The proposed Second-Order Kalman Filter method has been replaced with a synchronization unit into thePMUstructure to clarify the significance of the proposed new PMU.
基金This work was supported in part by the National Key R&D Program of China(No.2017YFB0902900)the National Natural Science Foundation of China(No.51707136)the Natural Science Foundation of Hubei Province(No.2018CFA080).
文摘Due to the high penetration of renewable distributed generation(RDG),many issues have become conspicuous during the intentional island operation such as the power mismatch of load shedding during the transition process and the power imbalance during the restoration process.In this paper,a phase measurement unit(PMU)based online load shedding strategy and a conservation voltage reduction(CVR)based multi-period restoration strategy are proposed for the intentional island with RDG.The proposed load shedding strategy,which is driven by the blackout event,consists of the load shedding optimization and correction table.Before the occurrence of the large-scale blackout,the load shedding optimization is solved periodically to obtain the optimal load shedding plan,which meets the dynamic and steady constraints.When the blackout occurs,the correction table updated in real time based on the PMU data is used to modify the load shedding plan to eliminate the power mismatch caused by the fluctuation of RDG.After the system transits to the intentional island seamlessly,multi-period restoration plans are generated to optimize the restoration performance while maintaining power balance until the main grid is repaired.Besides,CVR technology is implemented to restore more loads by regulating load demand.The proposed load shedding optimization and restoration optimization are linearized to mixed-integer quadratic constraint programming(MIQCP)models.The effectiveness of the proposed strategies is verified with the modified IEEE 33-node system on the real-time digital simulation(RTDS)platform.
基金The National Natural Science Foundation of China(No60496311)
文摘A remote antenna unit (RAU) selection model is presented, and two kinds of handoffs, intra-cell handoff (HO) and inter-cell HO, are defined in distributed mobile communications systems (DAS). After that, an inter-cell HO model is proposed, in which the average power of the active set (AS) is used to predict the position of the mobile station (MS). The total power of the AS and the handoff set (HOS) are utilized to determine whether an inter-cell HO is necessary. Furthermore, the relationship between HO parameters and performance metrics is studied in detail based on RAU selection. Simulation results show that both the intra-cell HO and the inter-cell HO can achieve oerfect performance by aoprooriate settings of HO parameters.