大直径筒仓滑模施工技术 被引量:12
1
作者 张荣富 苗志同 《山西建筑》 2009年第31期143-144,共2页
介绍了34 m大直径预应力钢筋混凝土筒仓采用刚性平台进行仓壁滑模施工,并对滑模装置设计及施工中应注意的问题作了总结,实施效果表明:原煤仓3个筒仓的滑模和仓顶锥壳的顶板施工顺利完成,取得了圆满成功。
关键词 34m直径筒仓 滑模施工 刚性平台 仓顶锥壳
下载PDF
Multi Objective Robust Active Vibration Control for Flexure Jointed Struts of Stewart Platforms via H∞ and μ Synthesis 被引量:6
2
作者 刘磊 王本利 《Chinese Journal of Aeronautics》 SCIE EI CAS CSCD 2008年第2期125-133,共9页
Active vibration control is needed for future space telescopes, space laser communication and other precision sensitive payloads which require ultra-quiet environments. A Stewart platform based hybrid isolator with 6 ... Active vibration control is needed for future space telescopes, space laser communication and other precision sensitive payloads which require ultra-quiet environments. A Stewart platform based hybrid isolator with 6 hybrid struts is the effective system for active/passive vibration isolation over 5-250 Hz band. Using an identification transfer matrix of the Stewart platform, the coupling analysis of six channels is provided. A dynamics model is derived, and the rigid mode is removed to keep the signal of pointing control. Multi objective robust H∞ and μ synthesis strategies, based on singular values and structured singular values respectively, are presented, which simultaneously satisfy the low frequency pointing and high frequency disturbance rejection requirements and take account of the model uncertainty, parametric uncertainty and sensor noise. Then, by performing robust stability test, it is shown that the two controllers are robust to the uncertainties, the robust stability margin of H, controller is less than that of μ controller, but the order of μ controller is higher than that of H, controller, so the balanced controller reduction is provided. Additionally, the μ controller is compared with a PI controller. The time domain simulation of the μ controller indicates that the two robust control strategies are effective for keeping the pointing command and isolating the harmonic and stochastic disturbances. 展开更多
关键词 vibration isolation active struts Stewart platform H∞ synthesis μ synthesis rigid mode model reduction
下载PDF
大直径筒仓仓顶结构施工技术 被引量:6
3
作者 张利 唐增旺 《山西建筑》 2010年第16期106-107,共2页
介绍了25 m直径圆形筒仓仓顶结构施工方案,采用刚性滑模平台支撑施工锥壳、桁架吊挂施工大梁,减少了大量周转材料的投入,缩短了工期,保证了安全和质量。
关键词 圆形筒仓 刚性平台 仓顶锥壳 桁架吊挂
下载PDF
受电弓-架空刚性接触网弓网系统动态仿真平台研究
4
作者 皋金龙 周玉杰 +1 位作者 李逢源 朱政 《电气化铁道》 2024年第4期67-72,共6页
受电弓-架空刚性接触网弓网系统动态性能的优劣对于列车安全运行产生重要影响,掌握刚性接触网弓网系统动态性能的有效途径之一是建立弓网动态仿真模型进行仿真分析。为保证弓网动态仿真计算的有效性和适用性,有必要开发受电弓-架空刚性... 受电弓-架空刚性接触网弓网系统动态性能的优劣对于列车安全运行产生重要影响,掌握刚性接触网弓网系统动态性能的有效途径之一是建立弓网动态仿真模型进行仿真分析。为保证弓网动态仿真计算的有效性和适用性,有必要开发受电弓-架空刚性接触网弓网系统动态仿真平台。本文根据工程实际应用,基于铁木辛柯梁理论与有限元理论建立刚性接触网弓网耦合动态仿真模型,开发受电弓-架空刚性接触网弓网系统动态仿真平台,与弓网在线实测数据进行对比验证其有效性与准确性,为刚性接触网设计及运维提供技术支撑。 展开更多
关键词 受电弓 架空刚性接触网 动态仿真 仿真平台
下载PDF
刚性承台桩基内力计算方法 被引量:1
5
作者 陈振民 温少荣 刘祚秋 《水运工程》 北大核心 2004年第3期71-75,共5页
针对港口工程中广泛使用的桩基础如何与刚性承台共同工作的问题,提出以杆系有限元方法为基础,将承台模拟成一根竖直刚性梁,将桩基模拟成线弹性梁,以承台与桩基相连的刚性杆上的节点作为主节点,桩基与承台相连的桩基上的节点为从节点,推... 针对港口工程中广泛使用的桩基础如何与刚性承台共同工作的问题,提出以杆系有限元方法为基础,将承台模拟成一根竖直刚性梁,将桩基模拟成线弹性梁,以承台与桩基相连的刚性杆上的节点作为主节点,桩基与承台相连的桩基上的节点为从节点,推导出了刚性承台和桩基主、从结点的单元刚度方程,并编写相应的有限元程序。算例表明,采用这种方法计算刚性承台桩基内力是可靠的、合理的。 展开更多
关键词 刚性承台 桩基内力 有限元
下载PDF
幼苗气力拾取弹性苗托的设计与试验 被引量:3
6
作者 张青 吕亚军 +4 位作者 初麒 黎波 王跃文 杨艳丽 辜松 《农业工程学报》 EI CAS CSCD 北大核心 2017年第4期69-75,共7页
幼苗气力拾取机构是育苗生产装备的关键机构,拾取机构采用气力拾取方法捡拾刚性平台上的幼苗时,由于幼苗存在个体差异,气力拾取手固定的吸附位置难以同时适应幼苗的尺寸和形态变化,存在损伤幼苗、作业耗时长耗能多的问题。针对以上问题... 幼苗气力拾取机构是育苗生产装备的关键机构,拾取机构采用气力拾取方法捡拾刚性平台上的幼苗时,由于幼苗存在个体差异,气力拾取手固定的吸附位置难以同时适应幼苗的尺寸和形态变化,存在损伤幼苗、作业耗时长耗能多的问题。针对以上问题,该文提出了一种由气力拾取手与弹性苗托构成的幼苗气力柔性拾取方法,设计了采用直径为0.32 mm钢丝进行缓冲的弹性苗托,对弹性苗托的结构参数进行了优化试验,并对刚性平台与弹性苗托的拾取性能进行了对比试验。试验结果表明:弹性苗托的两根缓冲钢丝支撑间距为9 mm,苗托槽口深度为6 mm,钢丝固定边距为4 mm的条件下,可保证对2.8~5.1 mm范围内茄子接穗苗的吸附成功率达到90%以上。在保证吸附直径4 mm茄子接穗苗成功的情况下,采用刚性平台时,平均幼苗损伤率为21%,平均吸附响应时间为0.08 s;采用结构参数优化后的弹性苗托时,平均幼苗损伤率降至5%,相对于刚性平台时损伤率减少16%,平均吸附响应时间减少至0.03 s,相对于刚性平台时作业时间减少62.5%。该研究结果为农业机器人幼苗拾取装置的开发提供了参考。 展开更多
关键词 机械化 优化 设计 幼苗 气力拾取 弹性苗托 刚性平台 负压
下载PDF
惯导托架自动校准系统的算法研究 被引量:2
7
作者 任会丽 《航空维修与工程》 2017年第2期54-57,共4页
惯导托架校准是飞机装配过程中非常重要的一部分工作,但是传统的校准方法存在精度低、耗时、费力等问题。为解决这些问题,设计了一种高精度、高效率的惯导托架自动校准算法。该方法通过建立静力学数学模型,结合传统惯导校准和位置误差... 惯导托架校准是飞机装配过程中非常重要的一部分工作,但是传统的校准方法存在精度低、耗时、费力等问题。为解决这些问题,设计了一种高精度、高效率的惯导托架自动校准算法。该方法通过建立静力学数学模型,结合传统惯导校准和位置误差最高点不动调平法的思想,对平台循环进行倾斜信息测试、判断和最高点不动调平。该方法的校准精度较高,极大缩短了校准时间,提高了校准效率。 展开更多
关键词 惯导托架 最高点不动调平法 位置误差法 刚性平台
原文传递
移动式液压支撑台架在跨既有线空间刚构施工中的应用技术 被引量:1
8
作者 张禄 《建筑技术开发》 2017年第10期1-3,共3页
近几年我国修建的上跨既有线桥梁多采用门式墩或连续梁结构。南龙铁路三明南大桥受既有鹰厦线和新建三明南站路基标高及环境限制,采用了空间刚构形式上跨既有线。三明南大桥设计长100.6 m的空间刚构顶板施工时,采用105 m移动液压支撑台... 近几年我国修建的上跨既有线桥梁多采用门式墩或连续梁结构。南龙铁路三明南大桥受既有鹰厦线和新建三明南站路基标高及环境限制,采用了空间刚构形式上跨既有线。三明南大桥设计长100.6 m的空间刚构顶板施工时,采用105 m移动液压支撑台架的上跨既有线施工方案,解决了施工场地严重受限,上跨既有线吊装不通视,"天窗点"时间短,工期要求紧,安全生产要求高等一系列施工难题。对Ⅱ级"天窗点"内空间刚构使用移动液压支撑,台架上跨既有线安装的施工组织、工艺流程、安全操作要点、台架调态对接等进行了总结。 展开更多
关键词 跨既有线 刚构 移动 液压 台架 吊装
下载PDF
H型钢梁、柱标准单元多功能胎架施工技术
9
作者 任旭晖 《山西焦煤科技》 2015年第10期20-22,共3页
为解决加工H型钢结构梁、柱标准单元件精度差、效率低、和同类结构件互换性欠佳的问题,对装配此类构件的多功能胎架进行了研究,提出了利用定型胎架平台对标准杆件进行组装,克服了人为采用量具进行定位产生的较大偏差,提高了生产效率,保... 为解决加工H型钢结构梁、柱标准单元件精度差、效率低、和同类结构件互换性欠佳的问题,对装配此类构件的多功能胎架进行了研究,提出了利用定型胎架平台对标准杆件进行组装,克服了人为采用量具进行定位产生的较大偏差,提高了生产效率,保证了标准件的互换性,为类似工程项目的装配提供了参考。 展开更多
关键词 刚性平台 匹配模板 定位胎架 互换性 装配精度
下载PDF
What Is the Import of the Abrahamic Avoidance of Naming God: A Platform for International Agreement?
10
作者 Paul A.Wagner 《Cultural and Religious Studies》 2021年第7期342-347,共6页
In the earliest Abrahamic scriptures,the writers made clear that God did not want to divulge a personal name he could be called.Despite all the differences among the Abrahamic traditions,one critical point all agree o... In the earliest Abrahamic scriptures,the writers made clear that God did not want to divulge a personal name he could be called.Despite all the differences among the Abrahamic traditions,one critical point all agree on is the decision that God’s creatures may refer to him and pray to him but not to speak to the God who declares“I am that I am”.It turns out that in the 20th century a Hassidic rebbe figured why that prohibition may be so critical to all cultural traditions of the Abrahamic collection of faiths.In addition,philosophy of language supports the rebbe’s reasoning as does an analogical argument about knowledge inaccessible to simultaneous objectifying.All this sums to the grounds for building a platform for international cooperation with religious understanding as more worthy and less risky than the scheming and greed surrounding economic competition. 展开更多
关键词 rigid designator The Great Conversation platform cooperation objectifying I-Thou
下载PDF
基坑开挖引起邻近盾构隧道转动与错台变形计算 被引量:28
11
作者 魏纲 洪文强 +2 位作者 魏新江 张鑫海 罗经纬 《岩土工程学报》 EI CAS CSCD 北大核心 2019年第7期1251-1259,共9页
基坑开挖会对邻近盾构隧道的变形产生显著影响。考虑基坑开挖时卸载在隧道轴线处产生的附加应力,建立了综合考虑剪切错台变形和刚体转动变形的隧道变形计算模型,结合最小势能原理推导出隧道的纵向变形量、环间错台量、环间转角和环间剪... 基坑开挖会对邻近盾构隧道的变形产生显著影响。考虑基坑开挖时卸载在隧道轴线处产生的附加应力,建立了综合考虑剪切错台变形和刚体转动变形的隧道变形计算模型,结合最小势能原理推导出隧道的纵向变形量、环间错台量、环间转角和环间剪切力的计算公式。选取两组工程实例进行分析,将计算结果与实测数据进行比较。研究结果表明:邻近并平行于盾构隧道的基坑侧壁的卸荷效应对旁边隧道的影响最大;隧道水平位移最大值附近的管片基本不发生错台变形和刚体转动变形,环间剪切力值也很小;而在隧道水平位移曲线的反弯点处,隧道的剪切错台量、环间转角和环间剪切力值达到最大;在基坑开挖工况下,邻近隧道的水平位移变形模式以剪切错台为主,刚体转动为辅。 展开更多
关键词 盾构隧道 刚体转动效应 剪切错台效应 基坑开挖 变形模式
下载PDF
公路路桥过渡段刚性楔形搭板设计参数优化 被引量:10
12
作者 裴涛 杜英辉 +1 位作者 陈雷 张尧禹 《公路》 北大核心 2019年第4期12-17,共6页
桥头搭板能够有效抑制桥头跳车,但普通搭板易引起二次跳车等现象对行车不利,而刚性楔形搭板则可改善该问题。以车体垂向加速度均方根、搭板两端错台高度作为控制指标,建立了7自由度车辆模型和过渡段三维动力学模型,分析了桥头搭板的不... 桥头搭板能够有效抑制桥头跳车,但普通搭板易引起二次跳车等现象对行车不利,而刚性楔形搭板则可改善该问题。以车体垂向加速度均方根、搭板两端错台高度作为控制指标,建立了7自由度车辆模型和过渡段三维动力学模型,分析了桥头搭板的不同参数组合下车辆和过渡段的动力特性,对楔形搭板的最大厚度、弹性模量、上表面坡度和长度等参数进行了优化设计。结果表明,当搭板最大厚度为30cm、弹性模量为2.8×10~4 MPa、上表面坡度为2%、长度不小于7m时,远离桥台一端的错台高度满足轻微错台标准;当搭板最大厚度为30cm、弹性模量为2.8×10~4 MPa、长度为8m、搭板上表面坡度不小于1%时,满足舒适性要求;搭板的弹性模量对错台高度的影响不显著。建议搭板材质选取C35,长度、最大厚度分别不小于7m和30cm,上表面坡度不小于1%,以满足人体舒适性和错台高度的要求。 展开更多
关键词 桥头搭板 刚性楔形搭板 评价指标 参数优化 垂向加速度均方根 错台高度
原文传递
大跨径连续刚构桥梁底维修平台设计 被引量:9
13
作者 魏魁 高洪波 《世界桥梁》 北大核心 2017年第1期82-86,共5页
某大跨径跨海大桥主桥为(124.4+170+124.4)m预应力混凝土连续刚构桥,为对该桥进行裂缝处理、混凝土表面缺陷修复及防护涂装,需在梁底下部搭建维修平台。结合该桥结构特点和桥下通航净空要求,维修平台采用倒梯形吊挂式钢管脚手架结构,由... 某大跨径跨海大桥主桥为(124.4+170+124.4)m预应力混凝土连续刚构桥,为对该桥进行裂缝处理、混凝土表面缺陷修复及防护涂装,需在梁底下部搭建维修平台。结合该桥结构特点和桥下通航净空要求,维修平台采用倒梯形吊挂式钢管脚手架结构,由Φ48mm×3.5mm钢管拼装成顺桥向每2m一道的横向支撑架,再由纵向钢管连接形成全封闭的梁底施工平台。采用有限元软件建立跨中及墩顶典型部位8m长倒梯形吊挂式钢管脚手架平台结构局部模型,经计算平台结构强度、刚度及稳定性均满足要求。实践证明该平台施工过程安全可靠。 展开更多
关键词 跨海大桥 刚构桥 箱形梁 倒梯形吊挂式钢管脚手架 维修加固 施工平台
下载PDF
严寒地区客运专线桥面C40细石纤维混凝土防水封闭层铺装工艺研究 被引量:9
14
作者 汤贵海 《铁道建筑技术》 2018年第2期29-33,共5页
新建北京至沈阳客运专线,采用双线CRTSⅢ型板式无砟轨道,设计时速350 km。安全性与耐久性对桥梁来说非常重要,若桥梁防水系统没有达到规定的要求和标准会造成桥梁结构破坏,尤其对于严寒地区高速铁路,防水混凝土的粉化、起皮、剥落、开... 新建北京至沈阳客运专线,采用双线CRTSⅢ型板式无砟轨道,设计时速350 km。安全性与耐久性对桥梁来说非常重要,若桥梁防水系统没有达到规定的要求和标准会造成桥梁结构破坏,尤其对于严寒地区高速铁路,防水混凝土的粉化、起皮、剥落、开裂等现象会破坏防水保护层结构,严重则影响着列车的运行安全。本工程采用防水卷材+C40细石纤维混凝土的复合形式作为结构防水封闭层,提高了防水混凝土的抗裂性和抗冻性。本文详细介绍了采用这种新型C40细石纤维混凝土防水封闭层铺装工艺的特点,从混凝土配比、原材的选择、外加剂的选择都做了一系列的调整和试验,最后确定了最佳的施工配合比、混凝土的塌落度、浇筑方式等一套铺装工艺,为同类工程提供经验和技术支持。 展开更多
关键词 刚性防水层 超薄玻璃纤维混凝土 施工配合比 振捣平台浇筑
下载PDF
青藏高原造山带的某些特征 被引量:7
15
作者 陈炳蔚 王彦斌 《地球学报》 EI CAS CSCD 1994年第Z2期45-53,共9页
以昆仑中央断裂为界,青藏高原可分为南、北两部分 ̄[1]。北部的造山带是在刚性基底地壳上发育起来的。造山前期是裂陷槽发展阶段,并经简单的碰合褶皱成山。造山期后构造变形也简单,以逆冲、叠覆构造为主。南部的造山带是在柔性基... 以昆仑中央断裂为界,青藏高原可分为南、北两部分 ̄[1]。北部的造山带是在刚性基底地壳上发育起来的。造山前期是裂陷槽发展阶段,并经简单的碰合褶皱成山。造山期后构造变形也简单,以逆冲、叠覆构造为主。南部的造山带是在柔性基底地壳上发育起来的。它的特点是活动性强,经多旋回开、合,造山前期出现有连贯性较好的洋盆及两侧广阔的陆缘沉积,造山期后变形复杂,除逆冲、叠覆构造外,出现大量平移断层。这一总的构造格局形成了青藏高原造山带一系列独有的特征。 展开更多
关键词 青藏高原 造山带 刚性基底 柔性基底 古西域地台 再生造山带
下载PDF
基于dSPACE的刚柔耦合多电机控制实验平台 被引量:7
16
作者 周林娜 王众 +2 位作者 刘金浩 常俊林 杨春雨 《实验技术与管理》 CAS 北大核心 2020年第11期120-124,共5页
为了满足刚柔耦合多电机控制的教学和科研需要,设计了一种基于dSPACE的刚柔耦合多电机控制实验平台。首先,综合考虑多电机之间刚性、柔性和刚柔耦合机械结构,设计了刚柔耦合多电机实验装置;然后,基于dSPACE硬件和软件设计了刚柔耦合多... 为了满足刚柔耦合多电机控制的教学和科研需要,设计了一种基于dSPACE的刚柔耦合多电机控制实验平台。首先,综合考虑多电机之间刚性、柔性和刚柔耦合机械结构,设计了刚柔耦合多电机实验装置;然后,基于dSPACE硬件和软件设计了刚柔耦合多电机控制实验平台,使平台能够实时监测各种信号,在线修改控制参数和更新控制算法;最后,通过实验表明该平台能够有效验证刚柔耦合多电机控制算法,为多电机控制的科研和教学提供必要的验证条件。 展开更多
关键词 DSPACE 刚柔耦合 多电机系统 实验平台
下载PDF
中马友谊大桥主桥深水基础临时结构设计及施工技术 被引量:2
17
作者 李宁 杜松 +1 位作者 王振 刘修成 《桥梁建设》 EI CSCD 北大核心 2023年第4期147-154,共8页
援马尔代夫中马友谊大桥主桥为(100+2×180+140+100+60)m混合梁V形支腿连续刚构桥,主墩均采用高承台群桩基础。该桥主墩基础施工面临珊瑚礁地层、深海、长周期波涌浪、航空限高及31个月超短工期等不利条件,桩基础采用全栈桥+钻孔平... 援马尔代夫中马友谊大桥主桥为(100+2×180+140+100+60)m混合梁V形支腿连续刚构桥,主墩均采用高承台群桩基础。该桥主墩基础施工面临珊瑚礁地层、深海、长周期波涌浪、航空限高及31个月超短工期等不利条件,桩基础采用全栈桥+钻孔平台方案施工,承台采用有底单壁钢吊箱围堰方案施工。在深水基础临时结构设计时,采用高桩大跨栈桥,应用半刚构体系将栈桥跨度提高至46.4 m;通过试桩等效水平推力试验得到钢管桩在波流循环作用下礁灰岩地层承载力设计依据;研发一种带叠合底板的钢吊箱围堰,解决了素封底混凝土开裂失效的问题。施工时,通过钢管桩打入性分析验证了大直径钢管桩在礁灰岩地层中施沉的可行性;研发高精度海浪预报系统,寻找作业窗口,保证栈桥沉桩效率;应用大刚度导向架及高精度调位系统,控制钻孔平台钢护筒基础的施沉精度;采用平台装配式整体吊装工艺,提高了恶劣海况下的施工效率及安全性;采用水封+干封二次封底工艺,保证了钢吊箱的封底质量。主桥深水基础下部结构在14个月时间完成,达到施工安全和主体结构质量控制目标。 展开更多
关键词 刚构桥 高桩承台 栈桥 钻孔平台 大直径钢管桩 钢吊箱围堰 临时结构设计 施工技术
下载PDF
机械臂的滑模控制器设计及仿真实验研究 被引量:1
18
作者 鲜娟 陈俊霖 +1 位作者 谌丽 李立 《实验室科学》 2023年第1期73-76,80,共5页
以多连杆机械臂为研究对象,设计滑模控制器来实现高精度的轨迹跟踪控制。首先建立受到参数不确定和外部扰动影响的多连杆机械臂动态模型;其次依据该受扰模型设计滑模面及相应的基于等效控制的滑模控制器;接着利用李雅普诺夫函数证明系... 以多连杆机械臂为研究对象,设计滑模控制器来实现高精度的轨迹跟踪控制。首先建立受到参数不确定和外部扰动影响的多连杆机械臂动态模型;其次依据该受扰模型设计滑模面及相应的基于等效控制的滑模控制器;接着利用李雅普诺夫函数证明系统的稳定性;同时采用饱和函数替代符号函数来抑制抖振现象。为了验证所设计的滑模控制算法的有效性,使用Matlab/Simulink软件搭建机械臂仿真测试平台。利用测试平台实现机械臂在PID控制、滑模控制和基于饱和函数的滑模控制三种控制方法下的轨迹跟踪实验。通过仿真实验教学,可以显著提高学生在机械臂建模和控制器设计方面的能力。 展开更多
关键词 机械臂 滑模控制 外部干扰 饱和函数 仿真实验平台
下载PDF
新型筒仓刚性滑模平台模块化设计研究 被引量:5
19
作者 孟文清 赵鹏 +2 位作者 张亚鹏 倪时华 杨雪尧 《煤炭工程》 北大核心 2020年第8期72-76,共5页
大直径筒仓滑模施工时,由于仓顶荷载大,仓顶结构施工需分多次浇筑,滑模平台需搭设临时竖向中心架及设置斜拉撑提高其承载能力,为解决此类措施成本高、工期长等问题,提出了一种新型模块化刚性滑模平台,该平台体系形式简单、传力路径明确... 大直径筒仓滑模施工时,由于仓顶荷载大,仓顶结构施工需分多次浇筑,滑模平台需搭设临时竖向中心架及设置斜拉撑提高其承载能力,为解决此类措施成本高、工期长等问题,提出了一种新型模块化刚性滑模平台,该平台体系形式简单、传力路径明确,既摆脱了竖向中心架搭拆,又解决了传统刚性滑模平台通用性低造成的平台闲置问题,可缩短工期,节约成本。利用有限元软件SAP2000与ABAQUS分别对不同直径刚性滑模平台进行整体与最不利拼接节点承载能力进行验算,结果表明模块化刚性滑模平台满足承载能力要求。 展开更多
关键词 筒仓 刚性滑模平台 模块化设计 节点设计 有限元计算
下载PDF
柔性群桩与地基相互作用的非线性分析 被引量:1
20
作者 刘杰 周德泉 赵明华 《土木工程学报》 EI CSCD 北大核心 2004年第12期55-61,共7页
对桩侧土采用非线性荷载传递函数 ,桩端土采用线性荷载传递函数 ,同时考虑桩周土所分担的荷载对桩基荷载传递规律的影响 ,首次将增量荷载传递矩阵法与微分方程的近似解法———子域法相结合 ,推出了刚性承台下柔性群桩与地基非线性相互... 对桩侧土采用非线性荷载传递函数 ,桩端土采用线性荷载传递函数 ,同时考虑桩周土所分担的荷载对桩基荷载传递规律的影响 ,首次将增量荷载传递矩阵法与微分方程的近似解法———子域法相结合 ,推出了刚性承台下柔性群桩与地基非线性相互作用的系列近似解析算式。得出了如下结论 :刚性承台下 ,中桩、承台边缘桩及角桩的桩侧摩阻力沿深度的分布规律不完全相同 ,且各桩侧摩阻力发挥的程度也不一样 ,角桩侧摩阻力发挥最大 ,边中桩次之 ,中桩侧摩阻力发挥最小。 展开更多
关键词 柔性群桩 非线性分析 刚性承台 复合地基 桩土相互作用
下载PDF