Construction management and technical innovation of the main project of Hong Kong–Zhuhai–Macao Bridge 被引量:7
1
作者 Yongling ZHU Jinwen ZHANG Xinglin GAO 《Frontiers of Engineering Management》 2018年第1期128-132,共5页
Design Units: CCCC Highway Consultants Co., Ltd.; China Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd. Construction Units: China Communications Construction Company Limited Consortium; China Rai... Design Units: CCCC Highway Consultants Co., Ltd.; China Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd. Construction Units: China Communications Construction Company Limited Consortium; China Railway Shanhaiguan Bridge Group Co., Ltd.; Wuhan Heavy Engineering Co., Ltd.; CCCC First Harbor Engineering Company Ltd. Consortium; Guangdong Changda High- way Engineering Co., Ltd.; China ZhongTie Major Bridge Engineering Group Co., Ltd. Consortium; Chongqing Zhixiang Paving Technology Engineering Co., Ltd.; Hunan Construction Engineering Group; China Railway Electrification Bureau Group Co., Ltd. Consortium 展开更多
关键词 Construction management technical innovation of the main project of Hong kong-zhuhai-macao bridge
原文传递
拱北隧道曲线管幕工程关键施工技术分析 被引量:4
2
作者 李同安 《路基工程》 2015年第6期144-147,共4页
拱北隧道管幕工程所处地层地质条件复杂,周边环境敏感,管幕由缓和曲线与圆曲线组成,要求精准顶进,形成管幕,施工难度大。经过分析,采用泥水平衡顶管施工、顶管轨迹控制及纠偏等关键技术用于拱北隧道曲线管幕工程的顶管施工,取得了良好... 拱北隧道管幕工程所处地层地质条件复杂,周边环境敏感,管幕由缓和曲线与圆曲线组成,要求精准顶进,形成管幕,施工难度大。经过分析,采用泥水平衡顶管施工、顶管轨迹控制及纠偏等关键技术用于拱北隧道曲线管幕工程的顶管施工,取得了良好的效果。 展开更多
关键词 港珠澳大桥 曲线管幕工程 泥水平衡顶管施工 顶管轨迹控制及纠偏 地表沉降控制
下载PDF
The design philosophy and bridge's technical innovation of Hong Kong- Zhuhai-Macao Bridge 被引量:3
3
作者 Meng Fanchao Liu Minghu Wu Weisheng Zhang Gejun Zhang Liang 《Engineering Sciences》 EI 2014年第3期48-57,共10页
This article introduces the project overview, construction goal and design philosophy of Hong Kong- Zhuhai-Macao Bridge. Based on large scale, factory production, standardization and assemble line, the innova- tive co... This article introduces the project overview, construction goal and design philosophy of Hong Kong- Zhuhai-Macao Bridge. Based on large scale, factory production, standardization and assemble line, the innova- tive concept is taken as the general principle for design with the emphasis on description of the new material, new technology, new construction method and new equipment used in the design. The application of innovative technology has provided a solid foundation and favorable guarantee for project quality and design service 展开更多
关键词 Hong kong-zhuhai-macao bridge large scale BASED standardization BASED and assembly BASED steeltubular composite PILE method of prefabricated PIER and PILE cap embedded below SEABED
下载PDF
Drivability of Large Diameter Steel Cylinders During Hammer-Group Vibratory Installation for the Hong Kong–Zhuhai–Macao Bridge 被引量:1
4
作者 W.J.Lu B.Li +3 位作者 J.F.Hou X.W.Xu H.F.Zou L.M.Zhang 《Engineering》 SCIE EI CAS CSCD 2023年第1期180-191,共12页
The Hong Kong–Zhuhai–Macao Bridge(HZMB)involved the installation of 120 mega-cylinders with a diameter of 22 m,weights up to 513 t,and penetration depths up to 33 m using an eight-vibratory hammer group.Due to the l... The Hong Kong–Zhuhai–Macao Bridge(HZMB)involved the installation of 120 mega-cylinders with a diameter of 22 m,weights up to 513 t,and penetration depths up to 33 m using an eight-vibratory hammer group.Due to the lack of engineering experience on the drivability of large-diameter cylinders under multiple vibratory hammers,predicting the penetration rate and time of steel cylinders is an open challenge that has a considerable impact on the construction control of the HZMB.In this study,the vibratory penetration of large-diameter steel cylinders in the HZMB is investigated based on geological surveys,field monitoring,and drivability analysis.The vibratory penetration rate,installation accuracy,and dynamic responses of the steel cylinders at both the eastern and western artificial islands are analyzed.The dynamic soil resistance has a great influence on the cylinder drivability.However,the current design methods for estimating the vibratory driving soil resistance are proven inaccurate without considering the scale effects.Therefore,a modified method with a normalized effective area ratio A_(r,eff)is proposed in this study to calculate the vibratory soil resistance for open-ended thin-wall cylinders under unplugged conditions.Considering the scale effects on the vibratory driving soil resistance,the proposed method leads to closer results to the measured data,providing a reference for future engineering practice. 展开更多
关键词 Hong kong-zhuhai-macao bridge Vibratory pile driving Wave equation analysis Large-diameter steel cylinder Artificial island offshore foundati ons
下载PDF
港珠澳大桥自然气象灾害交通管控标准研究 被引量:2
5
作者 李欣 刘坤 《公路》 北大核心 2022年第8期297-301,共5页
港珠澳大桥当前对于自然气象灾害的预警和管控按所属地法规和政策执行,尚没有实现协调统一。为了提升大桥管理效率和服务水平,调研了珠海、香港两地的管控依据、标准和措施,在同时满足两地相关法规的框架下,结合大桥运营面临的实际自然... 港珠澳大桥当前对于自然气象灾害的预警和管控按所属地法规和政策执行,尚没有实现协调统一。为了提升大桥管理效率和服务水平,调研了珠海、香港两地的管控依据、标准和措施,在同时满足两地相关法规的框架下,结合大桥运营面临的实际自然气象风险类型,提出了统一的气象灾害管控标准和措施建议,为大桥协同一体化管控提供参考。 展开更多
关键词 港珠澳大桥 气象灾害 交通管控
原文传递
HY-1C Coastal Zone Imager observations of the suspended sediment content distribution details in the sea area near Hong Kong-Zhuhai-Macao Bridge in China 被引量:1
6
作者 Lina Cai Minrui Zhou +4 位作者 Xiaojun Yan Jianqiang Liu Qiyan Ji Yuxiang Chen Juncheng Zuo 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2022年第11期126-138,共13页
The impacts of the Hong Kong-Zhuhai-Macao Bridge(HKZMB)on suspended sediment content(SSC)were analysed in the Zhujiang River Estuary based on data from HY-1C,which was launched in September 2018 in China,carrying Coas... The impacts of the Hong Kong-Zhuhai-Macao Bridge(HKZMB)on suspended sediment content(SSC)were analysed in the Zhujiang River Estuary based on data from HY-1C,which was launched in September 2018 in China,carrying Coastal Zone Imager(CZI)and Chinese Ocean Color and Temperature Scanner on it.A new SSC inversion model was established based on the relationship between in-situ SSC and the remote sensing reflectance in red and near-infrared bands of CZI image.HY-1C satellite data obtained from October to December 2019 were applied to retrieve SSC in the Zhujiang River Estuary.The results show that SSC around the HKZMB is ranging from 20 mg/L to 95 mg/L.SSC change obviously on two sides of the bridge.During flooding and ebbing period,SSC increases obviously downstream of the bridge.SSC difference between upstream and downstream is ranging from 5 mg/L to 20 mg/L.Currents flowing across the HKZMB,the change trend of SSC in most places upstream and downstream is almost the same that SSC downstream of the bridge is higher than SSC upstream.The tidal currents interact with bridge piers,inducing vortexes downstream,leading the sediment to re-suspend downstream of the bridge piers.Other factors,including seafloor topography and wind,can also contribute to the distribution of SSC in the Zhujiang River Estuary. 展开更多
关键词 HY-1C Coastal Zone Imager(CZI) Hong kong-zhuhai-macao bridge suspended sediment content Zhujiang River Estuary
下载PDF
Pavement structure and materials design for sea-crossing bridges and tunnel:Case study of the Hong Kong-Zhuhai-Macao Bridge 被引量:1
7
作者 Aimin Sha Wei Jiang +3 位作者 Jinhuan Shan Wangjie Wu Yupeng Li Shuangjiao Zhang 《Journal of Road Engineering》 2022年第2期99-113,共15页
With the continuous development of bridge and tunnel construction technologies,large-scale sea-crossing bridges and tunnels have gradually become the preferred choice for regional traffic.The construction technology o... With the continuous development of bridge and tunnel construction technologies,large-scale sea-crossing bridges and tunnels have gradually become the preferred choice for regional traffic.The construction technology of Hong Kong-Zhuhai-Macao Bridge(HZMB),one of the most representative sea-crossing passageways,is instructive for the construction of other large sea-crossing infrastructures.At present,the pavement design method of sea-crossing passageways lacks pertinence as it still refers to specifications for design of common pavement.Therefore,it is necessary to consider the bridge and tunnel pavement of HZMB as a typical example to analyze key technical problems encountered in its design,construction and operation.Novel solutions for material selection and structural design built upon the analysis of such critical problems should thus follow up.Based on comprehensive literature research,it can be found that environmental variability,tunnel closure,structural differential settlement and expansion deformation are the key technical problems faced by pavement of sea-crossing passageways.In view of the environmental variability,the steel deck-paving material and structure design of GMA-10 t SMA-13 is innovatively proposed.As for the closure of immersed tube tunnel,warm-mix flame retardant asphalt mixture is used to control pavement design through key indexes such as temperature and limit oxygen index.Regarding the deformation of immersed pipe joints,BJ200 asphalt seamless expansion joint material is introduced,which effectively satisfies the multi-directional deformation between pipe joints and ensures the smoothness of the road surface and driving comfort.For segmental joints,double-layer waterproof-coiled material is used to effectively prevent reflective cracks while ensuring the continuity of asphalt concrete pavement.Therefore,this paper provides a panel of ideas and methods for the pavement design of the same type of sea-crossing passageways. 展开更多
关键词 Hong kong-zhuhai-macao bridge Steel deck paving Immersed tunnel pavement GMA Flame retardant and smoke suppression Seamless expansion joint
下载PDF
To Promote the Communication of Talent in the Greater Bay Area
8
作者 Wen Wen 《China's Foreign Trade》 2019年第1期30-31,共2页
The opening of the Hong Kong-Zhuhai-Macao Bridge and the Guangzhou-Shenzhen-Hong Kong Highspeed Railway improved the connectivity of the Guangdong-Hong Kong-Macao Greater Bay Area by shortening the driving time betwee... The opening of the Hong Kong-Zhuhai-Macao Bridge and the Guangzhou-Shenzhen-Hong Kong Highspeed Railway improved the connectivity of the Guangdong-Hong Kong-Macao Greater Bay Area by shortening the driving time between the three areas within one hour,and injected new momentum into regional economic development.As a central city of Guangdong-Hong Kong-Macao Greater Bay Area,Hong Kong has established closer connections with the mainland through the Hong Kong-Zhuhai-Macao Bridge and high-speed railway,and unlocked new potential for the implementation of the Belt and Road Initiative.Under the current international environment of competitiveness,to build a world-level Bay Area with great vigor and vitality requires the fostering of a positive environment for talent both in China and abroad,in which their ingenuity and expertise flow freely. 展开更多
关键词 BIG BAY area TALENT exchange Hong kong-zhuhai-macao bridge
下载PDF
基于交通可达性的港珠澳大桥时空压缩效应 被引量:74
9
作者 吴旗韬 张虹鸥 +1 位作者 叶玉瑶 苏泳娴 《地理学报》 EI CSCD 北大核心 2012年第6期723-732,共10页
交通基础设施建设对地区经济和城市发展具有深远的影响,特别是跨江通道建设可极大提升海湾两岸城市群之间的交通和经济联系,因此研究跨江通道对海湾地区空间格局的影响具有重要的意义与价值。针对先前可达性模型中对非交通网络栅格均质... 交通基础设施建设对地区经济和城市发展具有深远的影响,特别是跨江通道建设可极大提升海湾两岸城市群之间的交通和经济联系,因此研究跨江通道对海湾地区空间格局的影响具有重要的意义与价值。针对先前可达性模型中对非交通网络栅格均质化处理的局限,在模型中对非交通网络栅格增加自然(水面、海拔、坡度)和土地利用类型等影响因素处理,对既有分析模型进行改进,使得交通可达性更符合实际情况。应用该改进模型计算了港珠澳大桥两种情景下珠三角区域可达性空间格局的变化,探讨港珠澳大桥对中心城市时间和费用可达性的影响。分析结果表明:①时间可达性分析中,在珠三角中心城市中,香港和珠海的时间可达性提高最多,而其他城市则影响较弱;②费用可达性分析中,港珠澳大桥的开通可极大减少香港和珠海往珠三角西岸和东岸的运输费用,同时,不同的大桥通行费用情况下,费用差异产生影响的空间范围差别相同,而不同地区的影响程度则有所差别。基于时间和费用可达性的变化,进一步讨论了港珠澳大桥的建设产生的影响。港珠澳大桥的建成能提升珠江口西岸地区的区位优势,促进区域融合和经济发展;能满足日益增长的跨界交通需求,将成为珠江口南部的重要通道,改变珠三角地区的交通空间格局。研究对产业影响表现有所差异,香港在商贸和服务业的优势将进一步凸显,而西岸地区的旅游业和房地产将不断受益。最后分析了政策和其他交通通道建设对港珠澳大桥的影响。 展开更多
关键词 港珠澳大桥 交通格局 珠三角 交通可达性 时空压缩
原文传递
港珠澳大桥岛隧工程设计施工关键技术 被引量:49
10
作者 尹海卿 《隧道建设》 2014年第1期60-66,共7页
港珠澳大桥岛隧工程是连接香港、珠海及澳门的大型跨海通道。主要介绍了:1)人工岛的设计方案、钢圆筒制作运输及振沉技术;2)沉管隧道设计施工关键技术,如沉管隧道基础、深埋大回淤节段式沉管、沉管管节预制、沉管浮运及安装、曲线段管节... 港珠澳大桥岛隧工程是连接香港、珠海及澳门的大型跨海通道。主要介绍了:1)人工岛的设计方案、钢圆筒制作运输及振沉技术;2)沉管隧道设计施工关键技术,如沉管隧道基础、深埋大回淤节段式沉管、沉管管节预制、沉管浮运及安装、曲线段管节等;3)各施工阶段的主要专用设备,如8锤联动大型圆筒同步振沉系统、定深平挖抓斗船(精挖)、耙头定压专用清淤船和全断面预制液压模板系统等。解决了工程中遇到的众多问题,克服了重重困难,取得了一定进展。 展开更多
关键词 港珠澳大桥 人工岛 沉管隧道 钢圆筒 振沉技术 基槽粗挖 精挖 基槽清淤 基础抛石夯平 碎石基床铺设 节段式沉管 沉管管节预制 大型液压模板系统 沉管浮运及安装
下载PDF
管幕冻结法积极冻结方案模型试验研究 被引量:40
11
作者 胡向东 任辉 +2 位作者 陈锦 程勇 张军 《现代隧道技术》 EI 北大核心 2014年第5期92-98,共7页
港珠澳大桥珠海连接线拱北隧道工程预支护体系采用管幕法与人工冻结技术相结合的全新"管幕冻结法"施工。根据工程实际情况,首次提出了在管幕钢管内部布置"圆形主力冻结管"、"异形加强冻结管"和"升... 港珠澳大桥珠海连接线拱北隧道工程预支护体系采用管幕法与人工冻结技术相结合的全新"管幕冻结法"施工。根据工程实际情况,首次提出了在管幕钢管内部布置"圆形主力冻结管"、"异形加强冻结管"和"升温盐水限位管"三种特殊管路构成的冻结方案。为了研究该冻结方案的有效性与可控性,进行了大型物理模型试验。文章主要介绍了模型试验概况,重点分析了开挖前积极冻结阶段冻结的试验效果。试验结果表明,积极冻结阶段冻土帷幕发展显现了预期规律,冻结效果显著;管幕间形成良好的冻土帷幕,可确保良好的止水效果。 展开更多
关键词 港珠澳大桥 拱北隧道 管幕冻结法 模型试验 冻结方案
下载PDF
沉管隧道技术应用及发展趋势 被引量:40
12
作者 陈越 《隧道建设》 北大核心 2017年第4期387-393,共7页
随着我国城市化进程快速推进,很多大城市集中在江河两岸或江河入海口附近,沉管隧道具有埋深浅、通行能力大、线路短、横断面形状选择灵活、管节预制质量易于控制和防水效果好等优点,使得沉管隧道技术得到广泛应用和迅速发展。1)归纳沉... 随着我国城市化进程快速推进,很多大城市集中在江河两岸或江河入海口附近,沉管隧道具有埋深浅、通行能力大、线路短、横断面形状选择灵活、管节预制质量易于控制和防水效果好等优点,使得沉管隧道技术得到广泛应用和迅速发展。1)归纳沉管隧道的主要技术,有隧道位置的选择原则与建设条件调查、几何设计、结构与防水设计、接头处理、基础处理、管节浮运沉放等;2)从隧道的精细化地质勘察、基础处理、基础垫层处理和消防技术等方面,介绍目前世界上建造规模最大的沉管隧道——港珠澳大桥沉管隧道施工关键技术,其建设标志着我国沉管隧道技术已达到国际先进水平;3)结合国内外沉管隧道修建情况,总结沉管隧道工程技术的发展趋势:规模不断增大、环境适应性越来越强、施工装备水平不断提升、最终接头技术不断进步;4)随着沉管隧道理论设计、施工工艺和配套工程的不断发展,关键技术的不断完善,新工程的不断建设,以及新技术、新工艺和新设备的不断涌现,将推进沉管法隧道技术再上新台阶。 展开更多
关键词 沉管隧道 港珠澳大桥 管节浮运沉放 管节接头 地质勘查 基础处理 隧道消防技术
下载PDF
港珠澳大桥钢结构桥梁建设综述 被引量:37
13
作者 苏权科 谢红兵 《中国公路学报》 EI CAS CSCD 北大核心 2016年第12期1-9,共9页
为了给超长跨海钢结构桥梁的建设提供参考,综述了港珠澳大桥的建设实践。介绍了大桥的建设制约条件、建设目标及理念,以及大桥的景观设计,说明了超长钢桥选型的主要考虑因素:抗震性能、耐久性、施工性、结构维护和环保。关于钢箱梁设计... 为了给超长跨海钢结构桥梁的建设提供参考,综述了港珠澳大桥的建设实践。介绍了大桥的建设制约条件、建设目标及理念,以及大桥的景观设计,说明了超长钢桥选型的主要考虑因素:抗震性能、耐久性、施工性、结构维护和环保。关于钢箱梁设计,重点介绍了单体大悬臂钢箱梁正交异性板的疲劳设计要点、参数优化结果、疲劳细节构造及足尺模型疲劳试验情况,并对使用调谐质量阻尼器应对主梁涡激振动的情况进行了介绍。关于施工质量管理,在全过程品质保证/品质控制(QA/QC)技术要求、质量控制和验收标准的基础上,对多项专项产品技术管理进行了介绍,数个首次使用的标准(如不锈钢钢筋、桥梁检查车等)可为中国行业标准的建立和完善提供参考。介绍了钢结构制造过程中有关加工、制作、焊接和检测的新技术与新工艺,这些要求可提高生产效率、改善工人工作环境、消除人为误差、提高制造精度并保证钢结构品质的稳定性。关于海上吊装,重点介绍了3座斜拉桥的钢塔吊装技术。关于防护涂层及维护,重点介绍了挥发性有机化合物(VOC)含量限值等环保性能指标及钢箱梁箱内、箱外检修车系统特点。综述分析表明:港珠澳大桥"四化"要求促进了钢结构各施工环节的工艺创新,机械化、自动化、信息化技术的应用,提升了中国桥梁钢结构加工企业的总体制作能力和管理水平;海上装配化施工,促进了海上大型设备的开发应用和吊装工法的创新,成功经验为海上工程的设计与施工开辟了新的途径;钢桥面铺装方案效果有待实践的检验。 展开更多
关键词 桥梁工程 港珠澳大桥 综述 钢箱梁 正交异性板 钢桥面铺装 质量保证
原文传递
港珠澳大桥主体工程建设项目管理规划 被引量:34
14
作者 张劲文 朱永灵 《公路》 北大核心 2012年第3期143-147,共5页
描述了港珠澳大桥主体工程建设项目管理规划文件框架,介绍了港珠澳大桥项目愿景和建设目标、项目管理总体策略、项目专用技术和管理标准,提出了以"建设目标—管理策略—专用标准"的金字塔模型作为项目管理规划框架的构建方法。
关键词 港珠澳大桥 项目管理 规划 主体工程
原文传递
跨海通道空间效益模型--以珠江口跨海通道为例 被引量:33
15
作者 吴旗韬 樊杰 +2 位作者 张虹鸥 孙威 叶玉瑶 《地理研究》 CSSCI CSCD 北大核心 2015年第11期2061-2072,共12页
跨海通道建设可缩短海湾两岸城市间交通时间,提升城市间经济联系。提出跨海通道空间效益理论模型,并采用城市相互作用强度引力模型,基于GIS计算珠江口港珠澳大桥和深中通道开通前后两岸城市最短时间矩阵,定量分析两岸城市可达性、经济... 跨海通道建设可缩短海湾两岸城市间交通时间,提升城市间经济联系。提出跨海通道空间效益理论模型,并采用城市相互作用强度引力模型,基于GIS计算珠江口港珠澳大桥和深中通道开通前后两岸城市最短时间矩阵,定量分析两岸城市可达性、经济联系强度和空间格局,验证理论模型的科学性。基本验证了跨海通道效益理论模型,结果表明:1珠三角加权可达性水平较高地区主要集中在核心地区,跨海通道对可达性影响较大地区主要分布在南部,从南向北逐渐减小。2跨海通道显著提升区域经济联系总量,深圳与香港、中山与澳门分别成为珠江口两岸提升最高的城市。跨海通道改变城市经济联系空间格局,促进区域经济联系分布更加均衡。3大陆与港澳间的通关时间是区域城市经济联系的重要影响因素,通关时间对区域经济联系总量的影响约占四分之一,未来需建立更加便捷的通关程序。 展开更多
关键词 空间效益模型 经济联系强度 港珠澳大桥 深中通道 交通可达性
原文传递
港珠澳大桥岛隧工程设计施工总承包模式构建 被引量:32
16
作者 张劲文 朱永灵 +1 位作者 高星林 刘刚 《公路》 北大核心 2012年第1期133-136,共4页
介绍港珠澳大桥岛隧工程设计施工总承包模式构建背景,该模式统筹考虑了价值引领、因地制宜、责任划分、风险划分、合同机制等构建策略,结合中国情境、国际惯例和项目特点构建了港珠澳大桥岛隧工程设计施工总承包模式并付诸实施。
关键词 港珠澳大桥 设计施工总承包 建设模式 岛隧工程
原文传递
超浅埋暗挖隧道管幕冻结法积极冻结方案试验研究 被引量:31
17
作者 任辉 胡向东 +1 位作者 洪泽群 张军 《岩土工程学报》 EI CAS CSCD 北大核心 2019年第2期320-328,共9页
港珠澳大桥珠海连接线拱北隧道口岸暗挖段,作为富水地区超浅埋暗挖隧道,采用管幕冻结预支护体系。以实顶管内"圆形主力冻结管"和空顶管内"异形加强冻结管"的不同组合方式形成实顶管单独冻结模式、实顶管与空顶管协... 港珠澳大桥珠海连接线拱北隧道口岸暗挖段,作为富水地区超浅埋暗挖隧道,采用管幕冻结预支护体系。以实顶管内"圆形主力冻结管"和空顶管内"异形加强冻结管"的不同组合方式形成实顶管单独冻结模式、实顶管与空顶管协同冻结模式和实顶管为主与空顶管为辅的冻结模式三类管幕冻结法积极冻结方案,结合设计方案要求,通过测点温度–时间曲线和冻土帷幕厚度两种不同分析方法,对以上方案进行了分析和验证。结果表明实顶管单独冻结模式不能在60 d内形成2 m厚冻土帷幕,实顶管与空顶管协同冻结模式30 d内即可形成2 m厚冻土帷幕,实顶管为主与空顶管为辅的冻结模式下异形冻结管滞后12 d和39 d开启60 d内均可形成2 m厚冻土帷幕,且异形冻结管开启后1~3 d即可达到管间封水要求。 展开更多
关键词 浅埋暗挖 管幕冻结 冻结方案 原型试验 港珠澳大桥 拱北隧道
下载PDF
港珠澳大桥工程创新管理实践 被引量:30
18
作者 高星林 张鸣功 +1 位作者 方明山 戴建标 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2016年第A01期12-26,共15页
基于港珠澳大桥工程复杂的边界条件,介绍了港珠澳大桥面临的管理和技术挑战;根据目标和需求,结合自主创新和市场资源,研究了港珠澳大桥管理和技术挑战的解决方法;系统地构建了项目管理模式,开展了新技术、新工艺、新材料、新设备的技术... 基于港珠澳大桥工程复杂的边界条件,介绍了港珠澳大桥面临的管理和技术挑战;根据目标和需求,结合自主创新和市场资源,研究了港珠澳大桥管理和技术挑战的解决方法;系统地构建了项目管理模式,开展了新技术、新工艺、新材料、新设备的技术攻关,分阶段、多层次地逐步逼近港珠澳大桥宏伟的建设目标。从一个侧面反映了"桥梁强国"、"大国制造"的实践历程。 展开更多
关键词 港珠澳大桥 岛隧工程 沉管 结构耐久性 钢结构工厂化
下载PDF
中国沉管法隧道典型工程实例及技术创新与展望 被引量:28
19
作者 李志军 王秋林 +1 位作者 陈旺 郭小龙 《隧道建设(中英文)》 北大核心 2018年第6期879-894,共16页
结合中国几例典型沉管法隧道工程,详细介绍中国沉管法隧道在基槽开挖与航道疏浚、干坞建设、管节预制、管节浮运、管节系泊、管节沉放、接头处理和基础处理等关键技术的应用现状。以在内河中游径流河道中修建的南昌红谷隧道和在外海修... 结合中国几例典型沉管法隧道工程,详细介绍中国沉管法隧道在基槽开挖与航道疏浚、干坞建设、管节预制、管节浮运、管节系泊、管节沉放、接头处理和基础处理等关键技术的应用现状。以在内河中游径流河道中修建的南昌红谷隧道和在外海修建的港珠澳大桥岛隧工程海底隧道为例,对在江河和海洋中修建沉管隧道的关键技术创新进行总结,包括:南昌红谷隧道管节浮运与沉放、管节沉放基础差异沉降控制、水下立交接线实现过江通道与沿线路网全互通快速衔接、水下空间开发与修建避难疏散大厅等关键修建技术创新,港珠澳大桥岛隧工程沉管法隧道干坞建设、管节预制、管节沉放和基础处理等关键修建技术创新。结合目前中国修建沉管法隧道涌现出的新技术、新工艺和新设备,从沉管隧道的拓展形式、行业领域突破、助推城市建设和江河湖海沿线城市交通需求的增加等方面展望未来沉管法隧道的发展趋势。 展开更多
关键词 沉管法隧道 南昌红谷隧道 港珠澳大桥 基槽开挖 干坞建设 管节预制 管节浮运 管节系泊 管节沉放 接头处理 基础处理
下载PDF
港珠澳大桥主体混凝土结构120a使用寿命耐久性对策 被引量:23
20
作者 王胜年 李克非 +2 位作者 范志宏 苏权科 熊建波 《水运工程》 北大核心 2015年第3期78-84,92,共8页
跨越伶仃洋海域的港珠澳大桥提出了120 a使用寿命的建设目标,如何提高外海、高温、高湿环境下混凝土结构耐久性是工程建设面临的重大问题之一。结合港珠澳大桥工程实践,在工程建设前期和设计施工阶段,开展了针对混凝土结构耐久性的系列... 跨越伶仃洋海域的港珠澳大桥提出了120 a使用寿命的建设目标,如何提高外海、高温、高湿环境下混凝土结构耐久性是工程建设面临的重大问题之一。结合港珠澳大桥工程实践,在工程建设前期和设计施工阶段,开展了针对混凝土结构耐久性的系列研究工作。在研究成果基础上,从耐久性设计、施工及后期维护等方面,提出了为确保港珠澳大桥达到120 a使用寿命所应采取的耐久性对策和措施。 展开更多
关键词 港珠澳大桥 混凝土结构 耐久性 寿命 设计 质量控制 维护
下载PDF