Transportation of tension leg platform (TLP) structures for a long distance has always been associated with the use of a heavy semi-transport vessel. The requirements of this type of vessel are always special, and t...Transportation of tension leg platform (TLP) structures for a long distance has always been associated with the use of a heavy semi-transport vessel. The requirements of this type of vessel are always special, and their availability is limited. To prepare for the future development of South China Sea deepwater projects, the China Offshore Oil Engineering Corporation has recently built a heavy lift transport vessel-Hai Yang Shi You 278. This semi-submersible vessel has a displacement capacity of 50k DWT, and a breath of 42 meters. Understanding the vessel's applicability and preparing it for use in future deepwater projects are becoming imminent needs. This paper reviews the current critical issues associated with TLP transportation and performs detailed analysis of the designed TLP during load-out and transportation. The newly built COOEC transportation vessel HYSY 278 was applied to dry transport of the TLP structure from the COOEC fabrication yard in Qingdao to an oil field in South China Sea. The entire process included the load-out of the TLP structure from the landsite of the fabrication yard, the offloading and float-on of the platform from the vessel, the dry transport of the TLP over a long distance, and the final offloading of the platform. Both hydrodynamic and structure analysis were performed to evaluate the behavior of the transport vessel and TLP structure. Special attention was paid to critical areas associated with the use of this new vessel, along with any potential limitations. The results demonstrate that HYSY 278 can effectively be used for transporting the structure with proper arrangement and well-prepared operation. The procedure and details were presented on the basis of the study results. Special attention was also given to discussion on future use based on the results from the analysis.展开更多
This paper focuses on the independent design and construction of HYSY981. HYSY981,which China National Offshore Oil Corporation(CNOOC) possesses its intellectual property right,is brought forward by advanced research,...This paper focuses on the independent design and construction of HYSY981. HYSY981,which China National Offshore Oil Corporation(CNOOC) possesses its intellectual property right,is brought forward by advanced research,concept design and combined basic design. The key technologies are the researches concerning global design,system integration,platform positioning,global performance analysis,structural strength and fatigue analysis,environment effect assessment of South China Sea,basin test and tunnel test,and construction technology of platform. Core technology of design and construction for the 6th deep water semi-submersible rig is held. Independent detail design and construction are also accomplished. These have improved technology of key equipment for China offshore oil exploitation.展开更多
文摘好氧发酵罐中有机物的发酵会产生大量的废热,为了更好地回收和利用这部分废热,设计了一个好氧发酵罐废热回收系统,并利用Aspen HYSY对系统的废气—水换热器和空气源热泵系统进行模拟和分析。模拟结果表明:在模拟工况(T =50 ℃、T c=55 ℃、T e=7 ℃, T air =25 ℃)下,以R134a为工质的热泵系统具有较高的COP和较低的压缩机排气温度,是该空气源热泵系统的理想循环工质;在南宁地区夏季(T c=55 ℃、T e=8 ℃, T air =32 ℃)和冬季(T c=60 ℃、T e=2 ℃, T air =15 ℃)模拟工况下,该热泵系统COP分别达到4.46和3.79,利用空气源热泵系统和废气-水换热器对好氧发酵罐的废气进行回收和利用是可行的;与传统电加热方式相比,该废热回收系统能有效降低能耗,具有明显的节能和环保效益。
基金Supported by the State Key Project "Installation Technical Study for Deepwater Floating Structures" under Grant No.2008ZX05026
文摘Transportation of tension leg platform (TLP) structures for a long distance has always been associated with the use of a heavy semi-transport vessel. The requirements of this type of vessel are always special, and their availability is limited. To prepare for the future development of South China Sea deepwater projects, the China Offshore Oil Engineering Corporation has recently built a heavy lift transport vessel-Hai Yang Shi You 278. This semi-submersible vessel has a displacement capacity of 50k DWT, and a breath of 42 meters. Understanding the vessel's applicability and preparing it for use in future deepwater projects are becoming imminent needs. This paper reviews the current critical issues associated with TLP transportation and performs detailed analysis of the designed TLP during load-out and transportation. The newly built COOEC transportation vessel HYSY 278 was applied to dry transport of the TLP structure from the COOEC fabrication yard in Qingdao to an oil field in South China Sea. The entire process included the load-out of the TLP structure from the landsite of the fabrication yard, the offloading and float-on of the platform from the vessel, the dry transport of the TLP over a long distance, and the final offloading of the platform. Both hydrodynamic and structure analysis were performed to evaluate the behavior of the transport vessel and TLP structure. Special attention was paid to critical areas associated with the use of this new vessel, along with any potential limitations. The results demonstrate that HYSY 278 can effectively be used for transporting the structure with proper arrangement and well-prepared operation. The procedure and details were presented on the basis of the study results. Special attention was also given to discussion on future use based on the results from the analysis.
基金National "863"Program "The study of 3000m depth water semi-submersible drilling rig key technology"( No.2006AA09A103)
文摘This paper focuses on the independent design and construction of HYSY981. HYSY981,which China National Offshore Oil Corporation(CNOOC) possesses its intellectual property right,is brought forward by advanced research,concept design and combined basic design. The key technologies are the researches concerning global design,system integration,platform positioning,global performance analysis,structural strength and fatigue analysis,environment effect assessment of South China Sea,basin test and tunnel test,and construction technology of platform. Core technology of design and construction for the 6th deep water semi-submersible rig is held. Independent detail design and construction are also accomplished. These have improved technology of key equipment for China offshore oil exploitation.