双主动全桥(dual active bridge,DAB)直流变压器能够通过直流线路互联多个电压等级的交流配电网形成交直流混合配电网,该系统的故障类型多样,故障特性复杂,该文对其故障特性进行详细研究。分析该系统发生交流网侧单相接地故障、交流阀...双主动全桥(dual active bridge,DAB)直流变压器能够通过直流线路互联多个电压等级的交流配电网形成交直流混合配电网,该系统的故障类型多样,故障特性复杂,该文对其故障特性进行详细研究。分析该系统发生交流网侧单相接地故障、交流阀侧单相接地故障以及直流母线单极接地故障后的故障特性,研究换流站直流侧电容中点采用直接接地和高阻接地两种接地方式的系统中,DAB对系统故障特性的影响。探究发生上述故障后,系统交流侧和直流侧的相互影响,并进行详细对比分析,提出含DAB系统的故障分析方法。最后,通过Matlab仿真平台对上述分析进行仿真验证,指出DAB对直流侧电容中点直接接地系统故障特性的影响更突出,且DAB能够隔离交直流侧故障的相互影响,为交直流混合配电网接地方式的选择、保护系统的设计等提供理论依据。展开更多
With the highly-extensive integration of distributed renewable energy resources(DER)into the grid,the power distribution system has changed greatly in the structure,function and operating characteristics.On this groun...With the highly-extensive integration of distributed renewable energy resources(DER)into the grid,the power distribution system has changed greatly in the structure,function and operating characteristics.On this ground,An AC-DC hybrid DER system becomes necessary for effective management and control over DER.This paper first summarizes the physical characteristics and morphological evolution of AC-DC hybrid DER system.The impact of these new features on system configuration planning is analyzed with respect to its flexible networking,rich operation control modes,and tight sourcenetwork-load-storage coupling.Then,based on a review of the existing research,problems and technical difficulties are figured out in terms of converter modeling,steady-state analysis,power flow calculation,operating scenarios management,and optimization model solution.In light of the problems and difficulties,a framework for the configuration optimization of AC-DC hybrid DER systems is proposed.At last,the paper provides a prospect of key technologies from six aspects including morphology forecasting,coupling interaction analysis,uncertainty modeling,operation simulation,optimization model solving algorithm and comprehensive scheme evaluation.展开更多
This paper proposes a voltage source converter (VSC) -based AC-DC hybrid distribution system (HDS) resilient model to mitigate power outages caused by wildfires. Before a wildfire happens, the public-safety power shut...This paper proposes a voltage source converter (VSC) -based AC-DC hybrid distribution system (HDS) resilient model to mitigate power outages caused by wildfires. Before a wildfire happens, the public-safety power shutoff (PSPS) strategy is applied to actively cut some vulnerable lines which may easily cause wildfires, and reinforce some lines that are connected to critical loads. To mitigate load shedding caused by active line disconnection in the PSPS strategy, network reconfiguration is applied before the wildfire occurrence. During the restoration period, repair crews (RCs) repair faulted lines, and network reconfiguration is also taken into consideration in the recovery strategy to pick up critical loads. Since there exists possible errors in the wildfire prediction, several different scenarios of wildfire occurrence have been taken into consideration, leading to the proposition of a stochastic multi-period resilient model for the VSC-based AC-DC HDS. To accelerate the computational performance, a progressive hedging algorithm has been applied to solve the stochastic model which can be written as a mixed-integer linear program. The proposed model is verified on a 106-bus AC-DC HDS under wildfire conditions, and the result shows the proposed model not only can improve the system resilience but also accelerate computational speed.展开更多
In a hybrid AC/DC medium voltage distribution network, distributed generations(DGs), energy storage systems(ESSs), and the voltage source converters(VSCs)between AC and DC lines, have the ability to regulate node volt...In a hybrid AC/DC medium voltage distribution network, distributed generations(DGs), energy storage systems(ESSs), and the voltage source converters(VSCs)between AC and DC lines, have the ability to regulate node voltages in real-time. However, the voltage regulation abilities of above devices are limited by their ratings. And the voltage regulation efficiencies of these devices are also different. Besides, due to high r/x ratio, node voltages are influenced by both real and reactive power. In order to achieve the coordinated voltage regulation in a hybrid AC/DC distribution network, a priority-based real-time control strategy is proposed based on the voltage control effect of real and reactive power adjustment. The equivalence of real and reactive power adjustment on voltage control is considered in control area partition optimization, in which regulation efficiency and capability are taken as objectives.In order to accommodate more DGs, the coordination of controllable devices is achieved according to voltage sensitivities. Simulations studies are performed to verify the proposed method.展开更多
The upscaling requirements of energy transition highlight the urgent need for ramping up renewables and boosting system efficiencies.However,the stochastic nature of excessive renewable energy resources has challenged...The upscaling requirements of energy transition highlight the urgent need for ramping up renewables and boosting system efficiencies.However,the stochastic nature of excessive renewable energy resources has challenged stable and efficient operation of the power system.Battery energy storage systems(BESSs)have been identified as critical to mitigate random fluctuations,unnecessary green energy curtailment and load shedding with rapid response and flexible connection.On the other hand,an AC/DC hybrid distribution system can offer merged benefits in both AC and DC subsystems without additional losses during AC/DC power conversion.Therefore,configuring BESSs on an AC/DC distribution system is wellpositioned to meet challenges brought by carbon reductions in an efficient way.A bi-level optimization model of BESS capacity allocation for AC/DC hybrid distribution systems,considering the flexibility of voltage source converters(VSCs)and power conversion systems(PCSs),has been established in this paper to address the techno-economic issues that hindered wide implementation.The large-scale nonlinear programming problem has been solved utilizing a genetic algorithm combined with second-order cone programming.Rationality and effectiveness of the model have been verified by setting different scenarios through case studies.Simulation results have demonstrated the coordinated operation of BESS and AC/DC hybrid systems can effectively suppress voltage fluctuations and improve the cost-benefit of BESSs from a life cycle angle.展开更多
文摘双主动全桥(dual active bridge,DAB)直流变压器能够通过直流线路互联多个电压等级的交流配电网形成交直流混合配电网,该系统的故障类型多样,故障特性复杂,该文对其故障特性进行详细研究。分析该系统发生交流网侧单相接地故障、交流阀侧单相接地故障以及直流母线单极接地故障后的故障特性,研究换流站直流侧电容中点采用直接接地和高阻接地两种接地方式的系统中,DAB对系统故障特性的影响。探究发生上述故障后,系统交流侧和直流侧的相互影响,并进行详细对比分析,提出含DAB系统的故障分析方法。最后,通过Matlab仿真平台对上述分析进行仿真验证,指出DAB对直流侧电容中点直接接地系统故障特性的影响更突出,且DAB能够隔离交直流侧故障的相互影响,为交直流混合配电网接地方式的选择、保护系统的设计等提供理论依据。
基金This work was supported by the National Key R&D Program of China(2017YFB0903300).
文摘With the highly-extensive integration of distributed renewable energy resources(DER)into the grid,the power distribution system has changed greatly in the structure,function and operating characteristics.On this ground,An AC-DC hybrid DER system becomes necessary for effective management and control over DER.This paper first summarizes the physical characteristics and morphological evolution of AC-DC hybrid DER system.The impact of these new features on system configuration planning is analyzed with respect to its flexible networking,rich operation control modes,and tight sourcenetwork-load-storage coupling.Then,based on a review of the existing research,problems and technical difficulties are figured out in terms of converter modeling,steady-state analysis,power flow calculation,operating scenarios management,and optimization model solution.In light of the problems and difficulties,a framework for the configuration optimization of AC-DC hybrid DER systems is proposed.At last,the paper provides a prospect of key technologies from six aspects including morphology forecasting,coupling interaction analysis,uncertainty modeling,operation simulation,optimization model solving algorithm and comprehensive scheme evaluation.
基金supported in part by National Key Research and Development Program of China(2022YFA1004600)in part by the National Natural Science Foundation of China(51977166,52277123)in part by the Natural Science Foundation of Shaanxi Province(2022JC-19)。
文摘This paper proposes a voltage source converter (VSC) -based AC-DC hybrid distribution system (HDS) resilient model to mitigate power outages caused by wildfires. Before a wildfire happens, the public-safety power shutoff (PSPS) strategy is applied to actively cut some vulnerable lines which may easily cause wildfires, and reinforce some lines that are connected to critical loads. To mitigate load shedding caused by active line disconnection in the PSPS strategy, network reconfiguration is applied before the wildfire occurrence. During the restoration period, repair crews (RCs) repair faulted lines, and network reconfiguration is also taken into consideration in the recovery strategy to pick up critical loads. Since there exists possible errors in the wildfire prediction, several different scenarios of wildfire occurrence have been taken into consideration, leading to the proposition of a stochastic multi-period resilient model for the VSC-based AC-DC HDS. To accelerate the computational performance, a progressive hedging algorithm has been applied to solve the stochastic model which can be written as a mixed-integer linear program. The proposed model is verified on a 106-bus AC-DC HDS under wildfire conditions, and the result shows the proposed model not only can improve the system resilience but also accelerate computational speed.
文摘In a hybrid AC/DC medium voltage distribution network, distributed generations(DGs), energy storage systems(ESSs), and the voltage source converters(VSCs)between AC and DC lines, have the ability to regulate node voltages in real-time. However, the voltage regulation abilities of above devices are limited by their ratings. And the voltage regulation efficiencies of these devices are also different. Besides, due to high r/x ratio, node voltages are influenced by both real and reactive power. In order to achieve the coordinated voltage regulation in a hybrid AC/DC distribution network, a priority-based real-time control strategy is proposed based on the voltage control effect of real and reactive power adjustment. The equivalence of real and reactive power adjustment on voltage control is considered in control area partition optimization, in which regulation efficiency and capability are taken as objectives.In order to accommodate more DGs, the coordination of controllable devices is achieved according to voltage sensitivities. Simulations studies are performed to verify the proposed method.
基金supported in part by the National Natural Science Foundation of China(No.51777134)in part by a joint project of NSFC of China and EPSRC of UK(No.52061635103 and EP/T021969/1).
文摘The upscaling requirements of energy transition highlight the urgent need for ramping up renewables and boosting system efficiencies.However,the stochastic nature of excessive renewable energy resources has challenged stable and efficient operation of the power system.Battery energy storage systems(BESSs)have been identified as critical to mitigate random fluctuations,unnecessary green energy curtailment and load shedding with rapid response and flexible connection.On the other hand,an AC/DC hybrid distribution system can offer merged benefits in both AC and DC subsystems without additional losses during AC/DC power conversion.Therefore,configuring BESSs on an AC/DC distribution system is wellpositioned to meet challenges brought by carbon reductions in an efficient way.A bi-level optimization model of BESS capacity allocation for AC/DC hybrid distribution systems,considering the flexibility of voltage source converters(VSCs)and power conversion systems(PCSs),has been established in this paper to address the techno-economic issues that hindered wide implementation.The large-scale nonlinear programming problem has been solved utilizing a genetic algorithm combined with second-order cone programming.Rationality and effectiveness of the model have been verified by setting different scenarios through case studies.Simulation results have demonstrated the coordinated operation of BESS and AC/DC hybrid systems can effectively suppress voltage fluctuations and improve the cost-benefit of BESSs from a life cycle angle.