With the enlargement of core rockfill dam construction scale and the improvement of construction mechanization level, the traditional manual construction quality control method is now difficult to meet the quality and...With the enlargement of core rockfill dam construction scale and the improvement of construction mechanization level, the traditional manual construction quality control method is now difficult to meet the quality and safety demands of modern dam construction, so automatic and real-time dam construction quality monitoring with high-techs is urgently needed. The paper makes theoretical research on construction quality real-time monitoring and system integration of core rockfill dam, proposes implementation method and integrated solution of construction quality real-time monitoring of core rockfill dam construction process, realizes refining, all-whether, entire-process and real-time control and analysis on key links of dam construction, and introduces the application of the construction quality real-time monitoring and system integration technology to a practical core rockfill dam project.展开更多
A complete scheme for solving the key scientific problems associated with high-standard,high-intensity continuous construction of high arch dams was presented. First,based on a coupling analysis of construction system...A complete scheme for solving the key scientific problems associated with high-standard,high-intensity continuous construction of high arch dams was presented. First,based on a coupling analysis of construction system decomposition and coordination for a high arc dam,a mathematical model for real-time control of construction quality and progress that considers complex constraints was developed. Second,a method of progress control was proposed based on a dynamic simulation. Third,a dynamic quality control mechanism was established based on construction information collected using a PDA. Fourth,a system for integrating collected information,progress simulation and quality control analyses under a network environment was developed. Finally,these methods were applied to a practical project to show that each aspect of a construction process can be managed effectively and that real-time monitoring and feedback control can be realized. Our methods provide new theoretical principles and technical measures for quality and progress control in the high arc dam construction process.展开更多
基金Supported by the National Natural Science Foundation of China (Grant Nos. 50525927, 50879056)
文摘With the enlargement of core rockfill dam construction scale and the improvement of construction mechanization level, the traditional manual construction quality control method is now difficult to meet the quality and safety demands of modern dam construction, so automatic and real-time dam construction quality monitoring with high-techs is urgently needed. The paper makes theoretical research on construction quality real-time monitoring and system integration of core rockfill dam, proposes implementation method and integrated solution of construction quality real-time monitoring of core rockfill dam construction process, realizes refining, all-whether, entire-process and real-time control and analysis on key links of dam construction, and introduces the application of the construction quality real-time monitoring and system integration technology to a practical core rockfill dam project.
基金supported by the National Basic Research Program of China("973"Project)(Grant No.2007CB714101)the National Key Technology R&D Program in the11th Five-year Plan of China(Grant No.2008BAB29B0501)the National Natural Science Foundation of China(Grant No.90815019)
文摘A complete scheme for solving the key scientific problems associated with high-standard,high-intensity continuous construction of high arch dams was presented. First,based on a coupling analysis of construction system decomposition and coordination for a high arc dam,a mathematical model for real-time control of construction quality and progress that considers complex constraints was developed. Second,a method of progress control was proposed based on a dynamic simulation. Third,a dynamic quality control mechanism was established based on construction information collected using a PDA. Fourth,a system for integrating collected information,progress simulation and quality control analyses under a network environment was developed. Finally,these methods were applied to a practical project to show that each aspect of a construction process can be managed effectively and that real-time monitoring and feedback control can be realized. Our methods provide new theoretical principles and technical measures for quality and progress control in the high arc dam construction process.