Measuring the geological disaster-risked situation, is a typical non-deterministic decision-making issue in disaster pre- vention and emergency response science for military engineering. Based on the given geological ...Measuring the geological disaster-risked situation, is a typical non-deterministic decision-making issue in disaster pre- vention and emergency response science for military engineering. Based on the given geological disaster risk analysis mechanism, geological disaster risk monitoring matrix was established, and risk characters’ value was obtained by mining the hidden information in the monitoring matrix with Entropy theory;with Identity, Discrepancy, and Contrary of Set Pair Analysis and distance measurement, geological disaster-risked model was erected for military engineering, and the steps were given for measuring geological disaster risk, which determined geological disaster-risked SPA force and order relationship of military engineering. Finally, case showed that model has the feasibility and effectiveness over measuring the geological disaster-risked situation for military engineering.展开更多
As one of the most powerful tools to reduce the earthquake loss, the Earthquake Disaster Management [EDM] and Insurance [EI] have been highlighted and have had a great progress in many countries in recent years. Earth...As one of the most powerful tools to reduce the earthquake loss, the Earthquake Disaster Management [EDM] and Insurance [EI] have been highlighted and have had a great progress in many countries in recent years. Earthquake disaster management includes a series of contents, such as earthquake hazard and risk analysis, vulnerability analysis of building and infrastructure, earthquake aware training, and building the emergency response system. EI, which has been included in EDM after this practice has been...展开更多
文摘Measuring the geological disaster-risked situation, is a typical non-deterministic decision-making issue in disaster pre- vention and emergency response science for military engineering. Based on the given geological disaster risk analysis mechanism, geological disaster risk monitoring matrix was established, and risk characters’ value was obtained by mining the hidden information in the monitoring matrix with Entropy theory;with Identity, Discrepancy, and Contrary of Set Pair Analysis and distance measurement, geological disaster-risked model was erected for military engineering, and the steps were given for measuring geological disaster risk, which determined geological disaster-risked SPA force and order relationship of military engineering. Finally, case showed that model has the feasibility and effectiveness over measuring the geological disaster-risked situation for military engineering.
基金The Natural Science Foundation of China (No. 50278028)the Scientific Research Foundation of Harbin Institute of Technology(HIT-2000,79).
文摘As one of the most powerful tools to reduce the earthquake loss, the Earthquake Disaster Management [EDM] and Insurance [EI] have been highlighted and have had a great progress in many countries in recent years. Earthquake disaster management includes a series of contents, such as earthquake hazard and risk analysis, vulnerability analysis of building and infrastructure, earthquake aware training, and building the emergency response system. EI, which has been included in EDM after this practice has been...