China Geodetic Coordinate System 2000(CGCS2000)has been used for several years as a formal published reference frame.The coordinates of all global navigation satellite system(GNSS)stations in China need to be correcte...China Geodetic Coordinate System 2000(CGCS2000)has been used for several years as a formal published reference frame.The coordinates of all global navigation satellite system(GNSS)stations in China need to be corrected to align with the CGCS2000 frame.Different strategies can be adopted for the realization of an optimal reference frame.However,different strategies lead to different results,with differences as great as several decimeters when GNSS station coordinates are transformed into CGCS2000-defined coordinates.The two common methods for the coordinate correction of a GNSS station are quasi-stable adjustment under CGCS2000 and plate movement correction,and the differences between their results can be greater than 10 cm.In this study,a statistic method called"supervised clustering"is applied to the selection of GNSS reference stations;a new scheme named"partition spacing"for the grouping of all processed GNSS stations is proposed;and the plate movement correction method is used to correct the coordinates of all GNSS stations from the GNSS epoch to the CGCS2000 epoch.The results from the new partitioning method were found to be significantly better than those from the conventional station-blocking approach.When coordinates from the stations without grouping were used as the standard,the accuracy of all the three-dimensional coordinate components from the new partitioning method was better than 2 mm.The root mean squares(RMSs)of the velocities in the x,y,and z directions resulting from the supervised clustering method were 0.19,0.45,and 0.32 mm∙a1,respectively,which were much smaller than the values of 0.92,0.72,and 0.97 mm∙a1 that resulted from the conventional approach.In addition,singular spectrum analysis(SSA)was used to model and predict the position nonlinear movements.The modeling accuracies of SSA were better than 3,2,and 5 mm in the east(E),north(N),and up(U)directions,respectively;and its prediction accuracies were better than 5 mm and 1 cm for the horizontal and vertical domains,respectively.展开更多
Optimum maintenance and availability of a series system whose components are subject to imperfect repairs are studied in this paper. Imperfect corrective maintenance is treated in a way that after it the life of each ...Optimum maintenance and availability of a series system whose components are subject to imperfect repairs are studied in this paper. Imperfect corrective maintenance is treated in a way that after it the life of each component in the system will be decreased to a fraction of its immediately previous one and the repair time will be increased to a multiple of the one immediately preceding it, where successive failure free times are independent and so are successive repair times. Under such an assumption, the limiting system availability, mean time between system failures or repairs are derived based on some related results. A numerical example is presented to compare with Barlow and Proschan's availability model. Two classes of maintenance cost models are proposed and the optimum maintenance policies are also discussed for series system with n components in this paper.展开更多
This paper considers a problem of optimal preventive maintenance and replacement schedule of equipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most o...This paper considers a problem of optimal preventive maintenance and replacement schedule of equipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most one replacement of the existing machinery by a new one is allowed. The problem is formulated as an optimal control problem subject to the state constraint that the remaining deposit at any given time is nonnegative. We show that the optimal preventive maintenance, production rates, and the replacement and salvage times of the existing machinery and the new one, if required, can be obtained by solving sequentially a series of free-end-point optimal control problems. Moreover, an algorithm based on this result is developed and used to solve two illustrative examples.展开更多
基金This study is supported by the National Key Research and Development Program of China(2016YFB0501405)Natural Resources Innovation Platform Construction and Capacity Improvement(A19090)The Fundamental Research Funds for Chinese Academy of Surveying and Mapping(AR1903 and AR2005).
文摘China Geodetic Coordinate System 2000(CGCS2000)has been used for several years as a formal published reference frame.The coordinates of all global navigation satellite system(GNSS)stations in China need to be corrected to align with the CGCS2000 frame.Different strategies can be adopted for the realization of an optimal reference frame.However,different strategies lead to different results,with differences as great as several decimeters when GNSS station coordinates are transformed into CGCS2000-defined coordinates.The two common methods for the coordinate correction of a GNSS station are quasi-stable adjustment under CGCS2000 and plate movement correction,and the differences between their results can be greater than 10 cm.In this study,a statistic method called"supervised clustering"is applied to the selection of GNSS reference stations;a new scheme named"partition spacing"for the grouping of all processed GNSS stations is proposed;and the plate movement correction method is used to correct the coordinates of all GNSS stations from the GNSS epoch to the CGCS2000 epoch.The results from the new partitioning method were found to be significantly better than those from the conventional station-blocking approach.When coordinates from the stations without grouping were used as the standard,the accuracy of all the three-dimensional coordinate components from the new partitioning method was better than 2 mm.The root mean squares(RMSs)of the velocities in the x,y,and z directions resulting from the supervised clustering method were 0.19,0.45,and 0.32 mm∙a1,respectively,which were much smaller than the values of 0.92,0.72,and 0.97 mm∙a1 that resulted from the conventional approach.In addition,singular spectrum analysis(SSA)was used to model and predict the position nonlinear movements.The modeling accuracies of SSA were better than 3,2,and 5 mm in the east(E),north(N),and up(U)directions,respectively;and its prediction accuracies were better than 5 mm and 1 cm for the horizontal and vertical domains,respectively.
文摘Optimum maintenance and availability of a series system whose components are subject to imperfect repairs are studied in this paper. Imperfect corrective maintenance is treated in a way that after it the life of each component in the system will be decreased to a fraction of its immediately previous one and the repair time will be increased to a multiple of the one immediately preceding it, where successive failure free times are independent and so are successive repair times. Under such an assumption, the limiting system availability, mean time between system failures or repairs are derived based on some related results. A numerical example is presented to compare with Barlow and Proschan's availability model. Two classes of maintenance cost models are proposed and the optimum maintenance policies are also discussed for series system with n components in this paper.
基金sponsored by NSERC and NSFC under Grant No.70771118 and 70371030.
文摘This paper considers a problem of optimal preventive maintenance and replacement schedule of equipment devoted to extracting resources from known deposits. Typical examples are oil drills, mine shovels, etc. At most one replacement of the existing machinery by a new one is allowed. The problem is formulated as an optimal control problem subject to the state constraint that the remaining deposit at any given time is nonnegative. We show that the optimal preventive maintenance, production rates, and the replacement and salvage times of the existing machinery and the new one, if required, can be obtained by solving sequentially a series of free-end-point optimal control problems. Moreover, an algorithm based on this result is developed and used to solve two illustrative examples.