By establishing a 3-dimensional hydrodynamic model of the Hongtang Bay and the validation tests,tidal currents of the area before and after the construction of the Sanya new airport project,which include two artificia...By establishing a 3-dimensional hydrodynamic model of the Hongtang Bay and the validation tests,tidal currents of the area before and after the construction of the Sanya new airport project,which include two artificial islands built respectively to accommodate the airport and its connected technology park,are simulated.The hydrodynamic impacts of the islands on the Hongtang Bay and surrounding waters were analyzed by comparing flow fields and velocities of tidal currents under the two conditions.展开更多
THE extension of the terminal at the Beijing Capital International Airport, one of the key construction projects of the Ninth National Five Year Plan, was completed successfully in September 1999. The Hshaped new term...THE extension of the terminal at the Beijing Capital International Airport, one of the key construction projects of the Ninth National Five Year Plan, was completed successfully in September 1999. The Hshaped new terminal building covers a total area of 336 thousand square meters -- four times that of the old one. It stands three floors above ground (part of it four floors) and one floor underground. Its opening upgrades peak time展开更多
文摘By establishing a 3-dimensional hydrodynamic model of the Hongtang Bay and the validation tests,tidal currents of the area before and after the construction of the Sanya new airport project,which include two artificial islands built respectively to accommodate the airport and its connected technology park,are simulated.The hydrodynamic impacts of the islands on the Hongtang Bay and surrounding waters were analyzed by comparing flow fields and velocities of tidal currents under the two conditions.
文摘THE extension of the terminal at the Beijing Capital International Airport, one of the key construction projects of the Ninth National Five Year Plan, was completed successfully in September 1999. The Hshaped new terminal building covers a total area of 336 thousand square meters -- four times that of the old one. It stands three floors above ground (part of it four floors) and one floor underground. Its opening upgrades peak time