Fine-Grained Work Element Standardization for Project Effort Estimation

Fine-Grained Work Element Standardization for Project Effort Estimation
下载PDF
导出
摘要 Traditional project effort estimation utilizes development models that span the entire project life cycle and thus culminates estimation errors. This exploratory research is the first attempt to break each project activity down to smaller work elements. There are eight work elements, each of which is being defined and symbolized with visually distinct shape. The purpose is to standardize the operations associated with the development process in the form of a visual symbolic flow map. Hence, developers can streamline their work systematically. Project effort estimation can be determined based on these standard work elements that not only help identify essential cost drivers for estimation, but also reduce latency cost to enhance estimation efficiency. Benefits of the proposed work element scheme are project visibility, better control for immediate pay-off and, in long term management, standardization for software process automation. Traditional project effort estimation utilizes development models that span the entire project life cycle and thus culminates estimation errors. This exploratory research is the first attempt to break each project activity down to smaller work elements. There are eight work elements, each of which is being defined and symbolized with visually distinct shape. The purpose is to standardize the operations associated with the development process in the form of a visual symbolic flow map. Hence, developers can streamline their work systematically. Project effort estimation can be determined based on these standard work elements that not only help identify essential cost drivers for estimation, but also reduce latency cost to enhance estimation efficiency. Benefits of the proposed work element scheme are project visibility, better control for immediate pay-off and, in long term management, standardization for software process automation.
出处 《Journal of Software Engineering and Applications》 2014年第8期655-669,共15页 软件工程与应用(英文)
关键词 PROJECT EFFORT Estimation WORK ELEMENT Symbolic Flow Map LATENCY Cost Software Process Automation Project Effort Estimation Work Element Symbolic Flow Map Latency Cost Software Process Automation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部