摘要 充填接顶技术是矿山充填采矿法的关键技术之一,关系到井下采空区地压控制,保证二步骤采场安全回采。以某矿山的充填接顶方法为研究对象,在现有充填接顶方法的基础上,克服了现有技术中的缺点,提供了一种采场充填的接顶方法,有效对充填接顶过程予以控制,提高充填采场的接顶率。 The technology of filling and connecting roof is one of the key technologies of filling mining method, which is related to the ground pressure control of underground goaf and ensures the safe stoping of two-step stope. Taking the method of filling and roof connection in a mine as the research object, on the basis of the existing filling connection method, it overcomes the shortcomings of the existing technology, and provides a stope filling connection method, which can effectively control the filling and roof connecting process and improve the top connection rate of filling stope.
作者 李小元
出处 《矿山工程》 2020年第4期476-480,共5页 Mine Engineering
关键词 充填接顶方法 脱水管 控制 观察 Roof-Contacted Filling Method Dewatering Pipe Control Observation
  • 相关文献

参考文献5

二级参考文献11

共引文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部