摘要 本文采用MELCOR程序,以某船用压水堆为研究对象,分析了冷却剂主管道冷管段中破口失水事故,将所得结果与该船用堆的安全分析报告进行了比对,验证了MELCOR在计算设计基准事故时的准确性。并针对安注方式、停泵时间对事故后果的影响进行了分析,对预测事故进程、缓解事故后果具有重要意义。 In this paper, MELCOR code was applied to analyze the break loss of coolant accident occurring at the cold leg in the main pipe, taking the ship reactor for the object of the research. And the results were compared with the safety analysis report for the ship reactor, which proved the accuracy of the calculation for design basic accident (DBA) by MELCOR. The consequences of the accident was analyzed according to the safety injection manner and the pump stopping time, which is important for predicting the accident progress and alleviating the consequence of the accident.
出处 《电力与能源进展》 2013年第3期105-108,共4页 Advances in Energy and Power Engineering
基金 国家自然科学基金资助项目(11075212)。
  • 相关文献

参考文献3

二级参考文献8

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部