考虑管理弹性的项目成本估算方法

Method of Project Cost Estimate with Regard to Managerial Flexibility
下载PDF
导出
摘要 针对项目成本超支问题,考虑项目的实际运作,将管理弹性的价值添加到项目管理中,力求更好地估计项目成本,最终使项目成本得到控制。抓住成本控制中"人"的因素,在给定项目运作方式的基础上,采用反应控制机制,得到更好的项目成本估算,有效地解决项目成本失控问题。 The paper, focusing on the problem of cost overrun of a project, adds managerial flexibility value to project management to have project cost controlled finally with considering the actual performing of a project. Through emphasizing the 'human' factor in cost control, the paper discusses resolving project cost overrun of a project by applying a reaction control mechanism with the given ways to run the project to develop a better method of project cost estimate.
作者 毕星 曲东
出处 《天津大学学报(社会科学版)》 2004年第3期259-261,共3页 Journal of Tianjin University:Social Sciences
关键词 成本估算 项目管理 管理弹性 反应 cost estimate project management managerial flexibility reaction
  • 相关文献

参考文献4

  • 1[1]Scotto M.Project budgeting:the key to bringing business projects in on-time and on-budget[J]. Project Management Journal,1994,25:35-42. 被引量:1
  • 2[2]Ulusoy G,Ozdamar L.A framework for an interactive project scheduling system under limited resources[J].European Journal of Operational Research,1996,90:362-375. 被引量:1
  • 3[3]Wollmer R D.Critical path planning under uncertainty[J].Mathematical Programmlng Study,1984,25:164-171. 被引量:1
  • 4董学会.弹性管理思想初探[J].华东经济管理,2000,14(1):14-15. 被引量:8

二级参考文献11

  • 1.《史记·货殖列传》[M].,.. 被引量:107
  • 2.《礼记·杂记下》[M].,.. 被引量:15
  • 3苏东水著.《管理心理学》,复旦大学出版社,1997年版. 被引量:2
  • 4[14]吴康零、吴畏主编《领导科学词典》第432页,第431页. 被引量:1
  • 5《管小·轻重乙》 被引量:1
  • 6泰罗(FrederickWinslowTaylor)美国管理学家,"科学管理"的创始人. 被引量:1
  • 7马斯洛(AbrahamH·Maslw)美国心理学家和行为科学家. 被引量:1
  • 8麦格雷戈(DouglasMcGregar)美国行为科学家"x-y"理论提出看. 被引量:1
  • 9西蒙(HerbertA·Simon)美国管理学家:"决策理论学派"代表. 被引量:1
  • 10菲德勒(FredE·Fiedler)美国管理学家"权变理论学派"代表引文转引自《管理学原理》第333页. 被引量:1

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部