摘要
为了严格保证带钢终轧温度,应在精轧机组间设置喷水冷却装置。通过离线模拟可以设计精轧道次的供水能力,同时了解冷却水量对终轧温度的影响。
It is necessary to setup water cooling system in finish rolling area to limit finished temperature of hot strip.In virtue of off-line simulation and calculation,not only the ability of accommodating water in each pass can be designed but also the relationship between quantity of water and finished temperature can be known.
出处
《轧钢》
2004年第2期27-29,共3页
Steel Rolling