广州地铁三号线大—沥盾构区间桩基加固处理 被引量:14

Pile foundation treatment for interval shield tunneling from Datang station to Lijiao station of No.3 Guangzhou subway
下载PDF
导出
摘要 详细介绍了广州地铁三号线大塘站—沥滘站区间盾构隧道施工中房屋桩基加固处理方案——桩基托换、筏基加固和顶升绕涠宰谢唬油谢辉怼⑹芰Ψ治觥⒓扑惴椒ā⒐丶ぷ骱图际醮胧┑确矫孀髁酥氐悴觥? The pile foundation strengthening treatment scheme, pile foundation underpinning, jack up and raft foundation strengthening for the interval shield tunneling from Datang station to Lijiao station of No.3 Guangzhou subway are described in detail. Specially, pile foundation underpinning is described emphatically from such aspects as underpinning principle, mechanical analysis calculation method, key construction contents and technical measures.
出处 《岩土力学》 EI CAS CSCD 北大核心 2004年第3期486-489,499,共5页 Rock and Soil Mechanics
关键词 地下铁道 区间隧道 桩基托换 筏基加固 顶升 subway interval tunnel pile foundation underpinning raft foundation reinforcement jack up
  • 相关文献

参考文献3

二级参考文献5

共引文献43

同被引文献97

引证文献14

二级引证文献143

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部