摘要
通常,大型钢筋混凝土筒库设计中,工作塔与筒体为自成沉降体系的单元,中间拉开一定距离.本文拟通过设计实例的分析,说明工作塔与筒体刚性相连是可行的.经济效益令人满意.
Generally speaking, in designing large-scale silos of reinforced concrete, the operating tower and the silo tank are respectively treated as a self-contained settlement system, and they are to be spaced out a certain distance apart. The paper makes a point of indicating, through the analysis of living examples in design, the feasibility of rigid conne-ction between operating tower and silo tank, with the economic perfor- mance proving satisfactory.
出处
《河南工业大学学报(自然科学版)》
CAS
1987年第3期78-82,共5页
Journal of Henan University of Technology:Natural Science Edition
关键词
基础设计
筒仓
工作塔
沉降
刚性
foundation design silo operating tower settlement rigid