摘要
文章针对复合手术室工程,结合设计和施工实践,从建筑结构与装饰维护要求,医疗设备的吊轨、地轨及基础,净化空调系统的配置,电气设计等方面详细阐述了复合手术室在设计与施工时的重点问题。
The article discusses the compound operation room construction, combining with the design and construction practice, explains the key issues like architectural structure and decoration maintenance requirements; hanging rails, ground rail and foundation of medical equipment; air-conditioning system configuration, electrical design during the compound operating room design and engineering.
出处
《中国医院建筑与装备》
2017年第2期82-84,共3页
Chinese Hospital Architecture & Equipment
关键词
复合手术室
电磁屏蔽
射线防护
净化空调
Compound operating room
Electromagnetic shielding
Radiation protection
Clean air conditioning