期刊文献+

高填方地基的蠕变沉降计算方法 被引量:19

Method of calculating creep deformation of high filled embankment
下载PDF
导出
摘要 高填方地基的填方体量大、填方高度高的特征决定了高填方地基具有较大的工后沉降,可能会影响工程的实际应用,研究高填方地基工后沉降的计算方法对于控制工后沉降具有重要意义。蠕变沉降是高填方地基工后沉降的重要组成部分,试验表明,土的蠕变变形主要受时间和应力历史等因素影响。基于考虑时间效应的统一硬化模型,以瞬时正常压缩线为参考线,引入弹性瞬时压缩线,建立了可以同时考虑时间和应力历史影响的高填方地基一维蠕变沉降计算方法,并对室内试验进行了计算,计算结果与试验结果基本一致。所建计算方法所用参数除一个参数外其余都为常见参数,而新参数可以通过常规试验确定,该计算方法便于工程应用。 The large quantity and high filled embankment makes the post-construction settlement very obvious, which influences the operation of the engineering. It is significant to study the method for calculating the post-construction settlement of high filled embankment in order to control the post-construction settlement. The creep deformation is an important component of the post-construction settlement of high filled embankment. Experimental results indicate that the creep deformation of high filled embankment is affected by both time and stress history. A method for calculating creep deformation that can consider stress history is proposed by combining the instantaneous elastic compression line and the framework of the time-dependent unified hardening model. Afterwards, the calculation results are the same as the results of the laboratory creep tests. Besides, the parameters used in the new calculation method are easily to be determined.
出处 《岩土力学》 EI CAS CSCD 北大核心 2015年第S1期154-158,共5页 Rock and Soil Mechanics
基金 国家重点基础研究发展计划项目(973计划)(No.2014CB047001) 国家自然科学基金(No.11272031) 北京市自然科学基金(No.8132042)
关键词 高填方地基 沉降 蠕变 high filled embankment settlement creep
  • 相关文献

参考文献8

  • 1张卫兵..黄土高填方路堤沉降变形规律与计算方法的研究[D].长安大学,2007:
  • 2Yang-Ping Yao,Ling-Ming Kong,An-Nan Zhou,Jian-Hua Yin.Time-Dependent Unified Hardening Model: Three-Dimensional Elastoviscoplastic Constitutive Model for Clays[J]. Journal of Engineering Mechanics . 2014 被引量:2
  • 3Tan,S.-A.Validation of hyperbolic method for settlement in clays with vertical drains. Soils and Foundations . 1995 被引量:1
  • 4Bjerrum L.Engineering geology of Norwegian normally consolidation marine clays as related to the settlement of building. Geotechnique . 1967 被引量:3
  • 5Singh A,Mitchell JK.General stress-strain-time function for soils. Jounrnal of The Soil Mechanics and Foundation Division, ASCE . 1968 被引量:2
  • 6WALKER LK,RAYMOND GP.PREDICTION OF CONSOLIDATION RATES IN CEMENTED CLAY. Canadian Geotechnical Journal . 1968 被引量:1
  • 7BUISMAN A S.Results of long duration settlement tests. Proceedings of 1st International Conference on Soil Mechanics and Foundation Engineering . 1936 被引量:1
  • 8CRAWFORD C B.Interpretation of the consolidation test. Soil Mechanics and Foundations Division . 1964 被引量:1

共引文献3

同被引文献212

引证文献19

二级引证文献127

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部